Jaypro Sports BMR-1 Manual Download Page 23

Rev- 

  Page 23 of 24 

TRANSPORTING CAGE: 

 

Cage can be transported by going forward or backward.  Transporting the cage should be done with 2 
or 3 people.  

 

Note:

 

Cage should only be transported in the fully folded position.  Never move cage when fully 

raised.     

1.

 

To transport the cage fully lower the upper frame.  Gather the net and baffle and secure it to the 
rear frame using the adjustable 6 foot strap (RP5066). 

2.

 

Lift the rear of the cage by lowering or raising the handle. With one operator steering and 
keeping the rear frame raised, two others are required to push against the cage in the two 
corners.  

To transport the cage sideways, rotate side wheels by releasing the retaining pins and rotating the 
wheels 90 degrees. Reinsert retaining pins. 

 
 
 
TOW HITCH (OPTIONAL): 
 

Caution:  

 

The Towing of the batting cage is not intended for road use, as neither the cage nor 
tow hitch is designed for transport on the road.    

 

Do not exceed 3 mph when transporting cage 

 

Do not allow anyone to ride on the batting cage during transport. 

 

Before moving ensure that the rear wheel has been lowered and pinned into position       

 
Install the tow hitch per instructions. 
Lower the rear wheel and pin both wheel arms in place using the two release pins. 
When frame is in lowered / playing position store release pins in the storage holes on each arm.  
 
 
 
 
 
 
 
 
 
 

Summary of Contents for BMR-1

Page 1: ...Rev Page 1 of 24 ALL STAR BATTING CAGE BMR 1 Call Jaypro Sports Equipment at 1 800 243 0533 during regular business hours for technical support www jaypro com...

Page 2: ...RATION OR MODIFICATION OF THIS EQUIPMENT MAY BE HAZARDOUS AND RESULT IN INJURY FOR REPAIR OR REPLACEMENT CONTACT YOUR DEALER OR JAYPRO SPORTS 6 DO NOT EXCEED MORE THEN 3 MPH WHEN TRANSPORTING THE BATT...

Page 3: ...6 4 HW5037 9 16 FLAT WASHER ZP 27 7 HW2047 3 8 SAE WASHER ZP GrNC 28 22 HW2044 1 2 SAE WASHER ZP GrNC 29 1 RP473 1 1 2 END CAP 30 10 HB5051 1 2 13 x 3 1 2 CARRIAGE BOLT ZP 31 10 HN268 1 2 13 UNC Thin...

Page 4: ...k all parts and check against parts list to ensure that all have been included Inspect all parts for damage Report any damages to the trucking company Select a large clear flat area to assemble the ca...

Page 5: ...Rev Page 5 of 24 Install reinforcing clamps Note Used tapered drive rod supplied to help align holes 1 Drill hole for 5 16 bolt use clamps as a template...

Page 6: ...Rev Page 6 of 24 Install side wheel swivel arms...

Page 7: ...Rev Page 7 of 24 See view 1 2...

Page 8: ...Rev Page 8 of 24...

Page 9: ...Rev Page 9 of 24...

Page 10: ...Rev Page 10 of 24 Install side wheels 1 Apply a light amount of lithium grease to the length of the rear wheel stem 2 Lift the rear frame and slide the rear wheel stem into the receiver...

Page 11: ...Rev Page 11 of 24 Note Use optional screw for permanent assembly Pin is for quick disconnect...

Page 12: ...Rev Page 12 of 24 Install upper frame mounting brackets...

Page 13: ...Rev Page 13 of 24 Install upper frame One at a time...

Page 14: ...Rev Page 14 of 24...

Page 15: ...Rev Page 15 of 24 Coaches stand...

Page 16: ...Rev Page 16 of 24 48 BUNGIE CORDS W HOOKS STL CORE P N RR5035...

Page 17: ...Tow Hitch Conversion Kit Purchased separately Note Install of tow hitch not covered here see additional supplementary installation provided with tow hitch part number BL TOWKIT Tow batting cage with a...

Page 18: ...THUD 46 THUD PAD 4 1 CR0016 1 8 CORD 300 FT ROLL 5 1 RP5012 ZIP TIES BAG OF 100 6 4 RP5066 ADJUSTABLE 6 FOOT STRAP 7 21 FM0028 SOFT FOAM PADDING OPTIONAL 8 4 FG5206 BLACK GAFFERS TAPE OPTIONAL 9 21 R...

Page 19: ...ar Using one of the temporary cords tie off the net to the crossbar Using additional cord pieces tie off the leading edge of the net every couple of feet to either side of the center Continue tying of...

Page 20: ...ssen any potential ricochet 10 Raise the 2nd arch using two strut and repeat step 9 for the third arch When complete raise the third arch into position 11 Starting at the center tie off every couple o...

Page 21: ...d bottom pipes of the lower frame using the zip ties 3 For best results start at the center and work out to the front corners Attach thud pad 1 With the cage in the open position attach the thud pad t...

Page 22: ...e with quick release pins or locking claw 5 Take two more struts and place inboard of the previous two struts on the second frame folding section horizontal pipe Secure using quick release pins or loc...

Page 23: ...push against the cage in the two corners To transport the cage sideways rotate side wheels by releasing the retaining pins and rotating the wheels 90 degrees Reinsert retaining pins TOW HITCH OPTIONAL...

Page 24: ...aint manufacturer s suggestions for proper application of paint primer All steel parts provided are either galvanized and or powder coated for extra protection but priming and painting should be adequ...

Reviews: