
2
3
EN
Positional diagram 1
Positional diagram 2
Positional diagram 3
Positional diagram 4
Positional diagram 5
Positional diagram 6
Positional diagram 7
Positional diagram 1
Positional diagram 2
Positional diagram 3
Positional diagram 4
Positional diagram 5
Positional diagram 6
Positional diagram 7
01. With flare nut in place and the tube end reamed,
clean. Insert the tube into the appropriate size
hole. Slide the Tube Positioning Plate over the hole
ensuring the tube touches the Plate lightly. Then
slide the Yoke over the top of the tube.
02. Line up the Arrow Indicator on the Yoke with the
Indicator on the block. Tighten the yoke locking
bolt.
03. Use a power drill set on slow and low torque
and start flaring. When the flaring head is free
spinning, the flare is complete.
04. Use a power drill to return the flaring head to the
original position. Then release the Yoke Locking
Bolt to move the Yoke to the back. Open the block
to remove the flared tube.
OPTION 1: POWER DRILL OPERATION
Positional diagram 1
Positional diagram 2
Positional diagram 3
Positional diagram 4
Positional diagram 5
Positional diagram 6
Positional diagram 7
Positional diagram 1
Positional diagram 2
Positional diagram 3
Positional diagram 4
Positional diagram 5
Positional diagram 6
Positional diagram 7
Arrow Indicator
Indicator
Block
Yoke
JAV-1034 JAVAC Edge Drill Powered Flaring Tool A5 manual.indd 3
07/01/2019 11:20
Summary of Contents for JAV-1034
Page 17: ...17 NOTES JAV 1034 JAVAC Edge Drill Powered Flaring Tool A5 manual indd 17 07 01 2019 11 21 ...
Page 18: ...18 NOTES JAV 1034 JAVAC Edge Drill Powered Flaring Tool A5 manual indd 18 07 01 2019 11 21 ...
Page 19: ...19 NOTES JAV 1034 JAVAC Edge Drill Powered Flaring Tool A5 manual indd 19 07 01 2019 11 21 ...