Page 6
2.
Getting Started
Packing list and CPE Unit
Upon receiving the product, please unpack the product package carefully. Each product is
shipped with the following items:
Table 2-1 Packing List
Outdoor CPE Products
Quantity
Main System unit
1
12V/ 1A DC Power Adapter
1
PC Ethernet Cable
1
If you find any of the items is missing, please contact our local distributor immediately.
CPE Unit:
Unpacking the Equipment Table 2-1 lists all the standard parts that are supplied in your LTE CPE
Unit Installation Package. Please take the time to unpack the package and check its contents
against this list.
Installing and power on
To power on the device, the indoor CPE uses a 12V DC power supply from the adapter. All
power adapters can operate in 100-240V AC range and therefore can be used in different
countries. Once the device is powered, the operator should wait for about 2 minutes before the
device becomes operational. The CPE SYS LED indicator will change from Blinking to Solid
orange light to indicate the device has completed the startup procedure.
To connect PC, LAN switch or other type of Ethernet device to the CPE product, the operator
should use standard CAT5 Ethernet cable and connect to the appropriate LAN port. Once
connected, the corresponding CPE LAN Green LED indicator should light up.
To use the phone service, operator can simply plug the phone line to the CPE RJ11 port in the
back. If the line is not registered or configured, a fast busy tone will be provided and the
corresponding Line LED will be off.