Installation
3
1.
Mount phone on the car station.
2.
Attach red lens cap and bezel to ¼” hole on car station.
3.
Insert LED into lens cap and plug wire into the white LED1 connector.
NOTE:
On 2 LED version phones, red LED (LED1) goes to “Call in
Progress” and green LED (LED2) goes to “Alarm Received”.
4.
Attach emergency button leads to the green connector at “BUT”.
5.
Attach phone line to the green connector at “TEL” or the P1 (TELCO)
modular phone jack if available.
NOTE:
See G3 Phone Layout and P.C. Board Diagrams for all
connections.
CAUTION:
To reduce or eliminate any possible interference, it is highly
recommended that the wiring used inside the traveling cable for the
incoming phone line is 20-22 AWG twisted shielded pair with the shield
grounded at the elevator controller end only. Any terminations or splices
between the elevator controller and the elevator phone should have the
shield carried through the termination of splice and not grounded at that
point.
Summary of Contents for G3
Page 5: ...P C Board Diagram 1 5 ...
Page 6: ...P C Board Diagram 2 6 ...
Page 7: ...P C Board Diagram 3 7 ...