
5
SVG 50/100
6. Commissioning
40
6. 1
Before
switching
on
the
installation
40
6. 2
Procedure for switching on the installation
40
6. 3
Procedure for switching off the installation
41
6. 3. 1 Automatic
powering
on
42
6. 4
Emergency
stop
(optional)
42
7. Precautionary
measures
during
maintenance
43
8. System
operation
44
8. 1
Monitoring and troubleshooting of models with LCD
44
8. 1. 1 4.3-inch
LCD
screen
44
8. 1. 2 The
“Data”
button
45
8. 1. 3 The
“Parameters”
button 49
8. 1. 4 The
“Measurement”
button
54
8. 2
Monitoring and troubleshooting of modules without display
60
8. 2. 1 7-inch
LCD
screen
60
8. 2. 2 The “Info” button – Realtime information
62
8. 2. 3 The
“Settings”
button
64
8. 2. 4 The
“Records”
button
67
8. 2. 5 The
“Help”
button
68
8. 2. 6 The
“About”
button
68
8. 2. 7 Menu
description
69
8. 3
System operation with more than one module without display
72
9. Troubleshooting
75
Appendix
1
–
Part
numbers 76
Appendix
2
–
Technical
data 77
Appendix 3 – Selection of cables and accessories
79
Appendix
4
–
Modbus
protocol
80