31
P
E
F
G
H
J
B
D
A
C
K
L
M
N
Con
ve
yor
Up/Do
wn
Swing
Fr
on
t Do
or
Rear Do
or
Co
nv
ey
or
Connector
•
Use a good set of Allen wrenches when changing orifices.
•
The cartridge should be tightened with 25 ft-lbs of torque.
•
The coil nut should be tightened with 5 ft-lbs of torque.
•
There is a spring, poppet valve, and ball bearing at the bottom of each coil.
•
The top coil operates the bottom port.
•
The bottom coil operates the top port.
•
When changing cartridge make sure all functions are at rest.
•
The lettering on the coils should always be facing up.
Valve Wiring
Letter Function
A
N/A
B
N/A
C
Conveyor Swing Front
D
Conveyor Swing Rear
E
Conveyor Up
F
Conveyor Down
G
Rear Door Up
H
Front Door Down
J
Power
K
Front Door Up
L
Rear Door Down
M
N/A
N
Conveyor Start
P
Ground
Letter Function
A
N/A
B
N/A
C
Conveyor Swing Front
D
Conveyor Swing Rear
E
Conveyor Up
F
Conveyor Down
G
Rear Door Up
H
Front Door Down
J
Power
K
Front Door Up
L
Rear Door Down
M
N/A
N
Conveyor Start
P
Ground
Summary of Contents for SpeedTender LC290
Page 2: ......