JP5530 1-3KVA
4
3.1 Unpacking Inspection
3.1.1 Open the packing box of UPS and take it out, visually examine the unit for transit damage.
3.1.2 Check against the accessory lists that the accessories of the UPS are present.(table 3-1)
。
3.1.3 If the UPS arrives damaged, or there is any missing accessory, please contact the distributor
immediately.
Table 3-1 Accessory list of UPS
Type
Accessory
Quantity
PC
Standard
User manual
1
PC
RS232 cable or USB cable (optional)
1
PC
IEC output power cord
1
PC
Long
back up
time
External battery cable
1
PC
User manual
1
PC
RS232 cable or USB cable (optional)
1
PC
IEC output power cord
1
PC
3.2 Installation notes
3.2.1 When locating UPS, make sure there is no hazardous objects around the UPS, and
that the installation environment meets the specification.
3.2.2 The UPS should not be titled. The air inlet port at the front panel and the outlet port on
the rear panel and two side panels should not be blocked so as to ensure good
ventilation.
3.2.3 In case if the UPS is unpacked, installed and used at very low temperatures,
condensations of water drops may appear. It is necessary to wait until the UPS fully
dried inside before proceeding to installation and use. Otherwise, they may be a risk of
electric shock.
3.2.4 Place the UPS near the utility power source outlet which supplies power to the UPS. In
any emergency, switch off the main input socket, cut off the battery input. All power
sockets must be connected with ground protection.
3.3 Cable connection
3.3.1 UPS input/output cables
1).UPS input cable connection
If the UPS is connected via the power cable, please use a proper socket with protection
against electric current, and pay attention to the capacity of the socket, over 10A for 1K(S)
、
over 16A for 2K(S)
、
over 16A for 3K(S)
,
the wiring configuration is shown in the following