jali Bookcase-Multi Assembly Instructions Manual Download Page 8

Page 8 of 10

Assembly Instructions: Multi Section Bookcase

11. Carefully stand the boxes up and 
position them adjacent to each other in 
the correct order. If they are too large to 
do safely, you’ll need to enlist some help. 
Ensure that they will not fall.

Adjust the feet height as necessary to bring 
the boxes in line with each other.

Connect the boxes together with two pairs 

of Connecting Screws, at the top and 

bottom of each box. Check that the screws 

engage properly before placing the larger 

(female) part through the RH Side, and 
then engage the screw from the LH Side. 
You may need two large pozi/flathead 

screwdrivers to fully engage the  

Connecting Screws.

12. Fit the Uprights to the Sides by 

aligning the cams and locking them into 

place.

Ensure all the cams are fully open 
before placing the Uprights.

To lock the Mid Upright cams, use a 

pozi screwdriver via the access holes 

on the Inner Box Sides

Fix with 

 

Connecting Screws

Fix with 

 

Connecting Screws

LH Upright

Mid Upright

RH Upright

NOW ASSEMBLE ALL THE OTHER BOXES

Summary of Contents for Bookcase-Multi

Page 1: ...Use the the Parts Diagram sheet to identify and distinguish between parts Any questions call us on 01227 833333 or email sales jali co uk You must fix your product safely in place Depending on your s...

Page 2: ...ple but don t worry it will become clearer as we work through The Outer Box Sides are the ones at each end of the whole unit e g Box 1 LH Side Box 3 RH Side The Inner Box RH Sides have a spacer attach...

Page 3: ...irst to avoid splitting the wood The Adjustable Foot should be set to about 25mm Outer Box Side Inner Box Side Front Edge Nickel Cam White Cam 20mm PAN Screw Foot Plate Adjustable Foot Set to 25mm 25m...

Page 4: ...rn the Divider over and screw in Cam Bolts in the same holes on the opposite side 4 On taller units one or more of the outer Shelves in the outer boxes may have a cam hole Place Nickel Cams in these 1...

Page 5: ...Place White Cams in the Box Base Box Top and Valance cam holes Depending on your design the Valance strip could be taller than this example Screw Cam Bolts into the 5mm holes along the Box Base front...

Page 6: ...helves Wherever if the Box Sides feature central Cam Bolts place one of the Shelves with cams with the cam facing towards the Box Base If the box has more than one Divider start by placing all the nec...

Page 7: ...in place continue to screw through the remaining 3mm holes with 25mm WSH Screws to help secure the Shelves 10 Place the Box Back onto the assembly with the engraving upwards and towards the Box Top a...

Page 8: ...bottom of each box Check that the screws engage properly before placing the larger female part through the RH Side and then engage the screw from the LH Side You may need two large pozi flathead screw...

Page 9: ...rts ensure that the mitre matches neatly with the Front Skirt They can be either glued in place or screwed from the inside using 30mm CSK Screws 14 Depending on your design you may have one of a varie...

Page 10: ...ont Skirting LH Skirting RH Skirting Locate the Top to the Box Tops using Dowels It can be glued into place screwed into place from beneath or left as is For 30mm Tops use 45mm CSK Screws For 18mm Top...

Reviews: