Three Hole Bidet Set
with Vacuum Breaker
ROUGHING-IN
DIMENSIONS
SMALL
END
LARGE
END
LARGE
END
VALVE
OUTLET
VALVE
OUTLET
PUTTY
1
2
3
1 0 9 1 5 4
1 0 9 1 5 4
1-1/2"
MAX 4"
1-1/8" D.
1-1/4" D.
MAX 7"
MAX 2"
11"
2-1/8"
DIA.
SPRAY
1-1/8 D.
MAX 13"
DIVERTER
AND VACUUM
BREAKER
LIFT ROD
CONNECTIONS ARE FOR1/2" IPS
FLEXIBLE SUPPLIES or 3/8" O.D.
BULL-NOSE RISERS
Plumbers' Putty or Caulking
Adjustable Wrench
Phillips Screwdriver
Channel Locks
TOOLS REQUIRED
Tubing Cutter
Regular Screwdriver
Basin Wrench
4
INSTALL SUPPLY HOSES
INSTALL SPRAY BODY
Connect small end of SUPPLY HOSES (1) TO "Y" ADAPTER (2)
and larger end to each VALVE OUTLET.
Important: Loop SUPPLY HOSES (1) as illustrated
so they do not kink.
Connect one end of SPRAY HOSE (7) to HOSE ADAPTER (8)
and the other end to shank of SPRAY BODY (3). Tighten hose
connections to make a water tight seal.
JA
DO
JAD
O
1
Apply putty to the underside of SPRAY BODY
FLANGE (3) and install SPRAY BODY (3) into
spray hole of Bidet.
From underside of Bidet install RUBBER WASHER (4),
FIBER WASHER (5) and LOCKNUT (6) onto shank of SPRAY
BODY (3). Tighten LOCKNUT (6).
4
8
5
6
7
6
Connect water supplies to FAUCET (1) with
1/2" IPS FLEXIBLE SUPPLIES (2) or 3/8"
O.D. BULL-NOSE RISERS (3). Use adjustable
wrench to tighten connections. Do not over
tighten. Be careful not to kink copper supply
when bending. Use tubing cutter to cut to
proper length.
Supply connections are made after bidet
has been installed.
3
2
HOT
HOT
COLD
FRONT
COLD
FERRULE
COUPLING
NUT
1
NOTE: FLEXIBLE SUPPLIES ARE NOT INCLUDED
AND HAVE TO BE PURCHASED SEPARATELY.
WATER SUPPLY CONNECTIONS
LEVER
HANDLE
CROSS
HANDLE
2-7/16"
D.
MOUNTING
SURFACE
JAD
O
JA
DO
1
Turn off hot and cold water
supplies before beginning.
CAUTION
2
FRONT
4
1
3
5
12
15
14
13
6
7
11
10
8
9
INSTALL TRANSFER VALVE
INSTALL CONTROL VALVES
Apply sealant or Teflon tape to threads of SPRAY ELL (1) and install
into TRANSFER VALVE (2).
Note: Arrow on SPRAY ELL (1) points
down, see illustration.
Install "Y" HOSE ADAPTER (3) with SEAL (4) to bottom nipple of
TRANSFER VALVE (2) and tighten to make a water tight seal.
Install LOWER CONE SEAL (5) onto TRANSFER VALVE (2) and
insert TRANSFER VALVE (2) from under side of Bidet into the
proper diverter hole.
Install UPPER CONE SEAL (6), FRICTION WASHER (7) and
MOUNTING NUT (8) onto TRANSFER VALVE (2).
Tighten MOUNTING NUT (8) to secure the TRANSFER VALVE (2)
and make a water tight seal.
Thread TRANSFER VALVE ESCUTCHEON (9) onto MOUNTING
NUT (8) until snug against bidet ledge.
COLD
HOT
BIDET
LEDGE
APPLY SEALANT
OR TEFLON TAPE
10˚
10˚
2
3
4
1
2
Remove LIFT ROD NUT (1), METAL WASHER (2) and
RUBBER SEAL WASHER (3) from LIFT ROD GUIDE (4).
Drop LIFT ROD GUIDE (4) into pop-up hole of bidet.
From below install RUBBER SEAL WASHER (3), METAL
WASHER (2) and secure guide assembly with LIFT ROD NUT (1).
LIFT ROD GUIDE INSTALLATION
5
INSTALL HANDLES (LEVER and CROSS)
6" to 12"
APPLY SEALANT
OR TEFLON TAPE
3
A FOAM SEAL (1) is installed on underside of FLANGE (2). (Plumbers
Putty may be used in place of FOAM SEAL (1) if desired.)
Apply sealant or Teflon tape to threads of TAILPIECE (10) and
thread into DRAIN BODY (7) making a water tight seal.
Drop FLANGE (2) into LAVATORY DRAIN (3). From below assemble
RUBBER GASKET (4), PLASTIC WASHER (5) and LOCK NUT (6) onto
DRAIN FLANGE (2). Do not tighten fully.
INSTALL POP-UP DRAIN
FIG. 3a
FIG. 3b
FIG. 3c
FIG. 3c
FIG. 3a
FIG. 3b
1
4
3
2
5
6
7
8
6
9
2
Adjust STOPPER (13) height by repositioning POP-UP ROD (16) in SWIVEL (15)
and tightening SET SCREW (18).
Assemble POP-UP SWIVEL (15) to PIVOT ROD (11) but do not tighten.
Drop POP-UP ROD (16) through other hole in POP-UP SWIVEL (15) and
tighten SET SCREW (17)
Assemble PIVOT ROD (11), and PIVOT NUT (12) as shown. Install CONCAVE
WASHER (19) into PIVOT ROD OPENING (9) if not preinstalled. Hand tighten
PIVOT NUT (12). Drop STOPPER (13) into drain.
(
To vandal proof drain rotate STOPPER (13) so PIVOT ROD (11) goes
through EYE (14) of STOPPER (13)
. Make connection to "P" TRAP.
Inspect inside DRAIN BODY (7) that SEAL (8) is installed. Thread
DRAIN BODY (7) tight against FLANGE (2) to make a water tight seal.
10
9
7
6
12
19
16
15
17
18
2
10
14
13
11
The PIVOT ROD OPENING (9) in DRAIN BODY (7) should face the rear
of the lavatory. Tighten LOCK NUT (6) on FLANGE (2) to make a water
tight connection with channel locks. Do not over tighten.
2-3/16" D.
2
1
Lever Handles:
Turn VALVE BODIES to off
position. Align HANDLES as shown or as
desired and install LEVER HANDLE (3) onto
VALVE STEM (5). Secure by tightening two
SET SCREWS (4) with HEX WRENCH (6) supplied.
Cross Handles:
Turn VALVE BODIES to
off position. Align HANDLES as shown
or as desired and install CROSS HANDLE (1)
onto VALVE STEM (5). Secure CROSS
HANDLES by threading INDEX BUTTON (2)
marked H into left valve stem and INDEX
BUTTON (2) marked C into right valve
stem.
7
5
4
Thread LOCKNUT (14) to bottom of VALVE BODY (13). Make sure
FIBER WASHER (15) and RUBBER WASHER (12) are installed.
Insert VALVE BODY (13) through mounting hole from underside
of mounting surface.
Note: VALVE BODY marked Hot is installed in the left mtg. hole,
VALVE BODY marked Cold in the right when facing front of fitting.
Maximum mounting surface thickness is 1-3/4".
Remove MOUNTING RINGS (10) and RUBBER
WASHERS (11) from VALVE BODIES (13).
11
10
THREAD
MTG. RING
PARALLEL TO
THIS POINT
6
3
From top install RUBBER WASHER (11) onto VALVE BODY (13). Thread
MOUNTING RING (10) on VALVE BODY (13) until tight against it's internal stop.
Set VALVE BODIES (13) so that their outlets are facing toward DIVERTER (2).
Tighten LOCKNUT (14) using 35mm or adjustable wrench.
For Diverter handle:
Install DIVERTER HANDLE (7)
onto VALVE STEM (8) of DIVERTER. Secure with
DIVERTER HANDLE SCREW (9). Thread HANDLE
CAP (10) onto DIVERTER HANDLE (7).
8
9
10
DIVERTER
PORCELIAN
LEVER
HANDLE