background image

1 0 9 6 3 5 A

1 0 9 6 3 5 A

Phillips Screwdriver

Teflon Tape

TOOLS REQUIRED

Regular Screwdriver

Roughing-in dimensions are for reference.

ROUGHING-IN DIMENSIONS

Turn off water at main supply.

CAUTION

By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).

1

51

31

19

75

31

0

1

5

1

3

1

1

9

7

5

3

1

1

5

1

3

1

1

9

7

5

3

1

3

COLDER

(Larger Numbers)

0 1 3 5 7 9 11 13 15

HOTTER

(Smaller Numbers)

0 1 3 5 7 9 11 13 15

Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)
for indication.

1

5

1

5

4

4

3

3

2

2

1

INSTALL VALVE TRIM

ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)

5

BACK TO BACK INSTALLATION
(SEE ILLUSTRATION STEP 6 FOR REFERENCE)

6

TEST INSTALLED FAUCET

Remove Handle and Trim from Valve. See
step 3 for reference.
Remove PRESSURE BALANCE UNIT (5). Rotate
PRESSURE BALANCE UNIT (5) 180˚ so that the inlets
face up and the large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make
sure inlets line up with holes in bottom of casting. Top
flange should butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).

Turn VALVE "off".

With HANDLE in "off" position, turn on water supplies
and check all connections for leaks.

Operate HANDLE and flush water lines thoroughly. Pull
DIVERTER and check SHOWER for proper operation.

Check SPOUT and SHOWER connections for leaks.

4

5

Adjustable Wrench

Channel Locks

Hex Wrench

(supplied)

Figure 1.

2

INSTALL HANDLE

Install HANDLE ADAPTER (1) onto VALVE STEM (3)
and secure with SCREW (4).

Align LEVER HANDLE (5) so lever is facing down and
tighten SET SCREW (6) with hex wrench to secure
LEVER HANDLE (5).

Thread LEVER (7) into LEVER HANDLE (5) to complete
handle installation.

Figure 3. 

Align PINS (8) on back side of

ESCUTCHEON (7) with the FOUR HOLES (9)
in ESCUTCHEON SUPPORT (5) and press
ESCUTCHEON (7) flush against finished wall.  

Figure 3.

8

7

5

9

4

5

6

3

7

1

HEX WRENCH

(SUPPLIED)

THREADED INLETS (STOPS)

INLETS

1/2" NPT

5-7/8"

OUTLETS
1/2" NPT

3-3/8"

1/2" NPT

FINISHED WALL

BOTTOM OF TUB

VALVE CARTRIDGE

48" TO 54" OPTIONAL

OPTIONAL TO

FINISHED FLOOR 

USUALLY BETWEEN

80'' AND 86''

"SEE
ILLUSTRATION"

1-5/8" TO 3-1/4"

Figure 2.

3

5

6

4

2

1

When finished tiling the wall, remove PLASTER GUARD (1).

Figure 1.

 Push CAP (2) over VALVE CARTRIDGE until

seated against stop. 

Figure 2. 

Mount ESCUTCHEON HOLDER (3) and gasket to valve body

with SCREWS (4). Mount ESCUTCHEON SUPPORT (5) to ESCUTCHEON
HOLDER (3) with SCREWS (6).

Reviews: