background image

 

M-2100-1: JBE-2100 Manual Call Point data sheet V1.0

 

Jade Bird Fire Alarm Systems – JadeBird.eu.com    3  /  4    JBE-2100.DSH.EN.210128

 

Installation

 

Always observe local fire and electric installation regulations.

 

1.

 

Secure the base to the wall (surface or flush mounted).

 

2.

 

Connect the wiring to the base as per the following diagram:

 

 

 

 

Terminals

 

Connection

 

1 & 2

 

Signal  loop  L1,  L2  (no 
polarity)

 

7 & 8

 

(Optional)  Normally  open 
clean contact switch

 

Max rating: 0.1 A, 30 V

 

3,4,5,6

 

Not connected

 

3.

 

Program an unused loop address (1 to 200) to the MCP head using the 
JBE-AT1 tool.

 

4.

 

Insert the MCP face into its base and push firmly.

 

5.

 

The head can be secured to the base by fitting an optional self-tapping 
screw (ST2.9x8) into its boss next to the reset keyhole.

 

6.

 

Register the MCP into the fire panel’s configuration.

 

7.

 

Test  each  MCP  and  wiring  integrity  after  installation  and  periodically 
according to local fire regulation.

 

 

Maintenance

 

Alarm test should be conducted regularly, recommending every 6 months.

 

 

Resetting an activated MCP

 

1.

 

Open the tab in the bottom of the MCP face.

 

2.

 

Insert the reset key.

 

3.

 

Rotate  key  counterclockwise  until  the  frangible  element  returns  to  its 
position.

 

 

Reviews:

Related manuals for JBE-2100