28
is installed where temperatures often drop below 0 °C because this
limits the “Smart Winter” anti-freeze protection (see related chapter).
Check of operation
First start-up
X
Remove the thermal cover from the hot tub and remove the
front and side panels, if present
(refer to the corresponding chapter)
.
X
Check that the filter cartridge is present in its container and
that the various components are properly installed
(see the chap-
ter on maintenance of the filter cartridge).
X
Check that the drain valve on the base (and the ball valves, if
installed) are closed
(refer to the pre-installation instructions en-
closed with the product).
NOTE for models with an overflow valve
:
the pipe that con-
nects the overflow to the drain must always be left open (refer to
the pre-installation instructions).
X
Check that all the hydromassage intakes are open.
X
Fill the hot tub so that the highest nozzles (back) are covered.
4-5 cm
Filling will be performed as decided beforehand by the customer
(see pre-installation sheet, “Preparation for installation” chapter).
If you use the hose for garden work, let water run for a while
before filling the hot tub. This will eliminate stagnant water in
the hose along with any bacteria that may cause irritations.
X
Turn on the all-pole circuit breaker located on the power sup-
ply line
(see the chapter on connections and electrical safety)
.
Notes:
- When first turned on, all of the numbers and LEDs on the control
panel will turn on. Following, the display will show the codes for the
software and firmware versions.
- In general, when the hot tub is filled for the first time, the water tem-
perature is lower than the set point set by the factory 35 °C). For this rea-
son, the heater and the pump, at low speed, are turned on. In any case
the control panel will display the temperature of the water in the tub.
- If the message “
FLO
” appears on the display, the pressure switch/
flow switch of the heater may be faulty. Please see chapter “Abnor-
mal operating conditions - Alarm signals”.
X
Press the TEST button of the differential switch located up-
stream from the electrical system to which the hot tub is con-
nected. If it does not trip, it may be faulty or it may have tripped
due to problems in the electrical system of the building.
Disconnect the hot tub and do not use it until you have iden-
tified and eliminated the defect.
X
Check the operation of the hydromassage pumps using the
“
Pump
”
key. The first time the key is pressed the pump starts
at low speed; the second time it is pressed, high speed; the third
time, the pump turns off.
X
Check that the spotlights switch on and off using the key
“
Light
”
.
X
Check that the blower (if included) switches on and off using
the key “
Blower
”
.
X
Check that there are no leaks from the hydraulic connections
or other problems.
X
Completely disinfect the hot tub by carrying out “
super-chlo-
rination
” treatment
.
Please refer to the Jacuzzi system water treatment guide
and relative catalogue for details on water quality mainte-
nance, the methods and warnings governing the use of rela-
tive chemical products.
X
After a few hours, turn off the omnipolar switch.
X
Open the drain valve(s) and completely empty the hot tub.
X
If included, re-install the front and side panels.
CAUTION
Do not use the hot tub the first time you start it as there
is a high concentration of chlorine in the water during
this phase. Immediately empty the bath.
Contact the local authorities for the standards govern-
ing the discharge of chemically treated water.
X
Close the drain valve(s) and fill the hot tub again with fresh
water as previously explained.
X
Turn the omnipolar switch back on and check that the hot
tub works correctly.
X
Check and as necessary modify the water filtering cycles
based on how you intend to use the hot tub.
Summary of Contents for Unique
Page 2: ......
Page 3: ...3 1 2 3 4 1...
Page 4: ...4 A B C D 1 1 6 2 M8 5 3 7 4 2...
Page 5: ...5 1 1 6 2 M8 5 3 4 2a...
Page 6: ...6 2b...
Page 8: ...8 1 2 2 9x19 mm 3 2 5 mm 2 5 mm 4...
Page 78: ...78 ON...