background image

Owner's Record

Save These Instructions for Future Use.

Date Purchased ____________________________________________________________

Purchased From ____________________________________________________________

Installed By ________________________________________________________________

Serial Number _____________________________________________________________

Model ____________________________________________________________________

2 WALL

Specifications _________________________________________________________________________ 2

Rough-in Reference ____________________________________________________________________ 3

Component Identification ________________________________________________________________ 4

Base Installation _______________________________________________________________________ 5-7

Tower and Glass Panels Installation ________________________________________________________ 8-12

3 WALL

Specifications _________________________________________________________________________ 13

Rough-in Reference ____________________________________________________________________ 14

Component Identification ________________________________________________________________ 15

Base Installation _______________________________________________________________________ 16-18

Tower and Glass Panels Installation ________________________________________________________ 19-22

2 & 3 WALL

Operation ___________________________________________________________________________ 23

Maintenance __________________________________________________________________________ 24

Authorized Service _____________________________________________________________________ 24

Tower Fixture Repair Parts _______________________________________________________________ 25

Tower Plumbing Repair Parts _____________________________________________________________ 26

2 Wall Unit Repair Parts _________________________________________________________________ 27

3 Wall Unit Repair Parts _________________________________________________________________ 28

Warranty _____________________________________________________________________________ 29-30

1

CONTENTS

Summary of Contents for Summer Rain 2 Wall and 3 Wall

Page 1: ...SUMMER RAIN 2 WALL 3 WALL WALK IN SHOWER SYSTEMS INSTALLATION AND OPERATING INSTRUCTIONS...

Page 2: ...user satisfaction We recommend that a licensed contractor perform the installation of all Jacuzzi Whirlpool Bath products Our warranty does not cover improper installation related problems IMPORTANT...

Page 3: ...______________________________ 13 Rough in Reference ____________________________________________________________________ 14 Component Identification __________________________________________________...

Page 4: ...Whirlpool Bath s responsibility for shipping damage ceases upon delivery of the products in good order to the carrier Refer any claims for damage to the carrier For definitions of warranty coverage an...

Page 5: ...WALL ROUGH IN REFERENCE 60 42 5 16 33 3 4 27 15 16 84 23 21 1 2 FRONT VIEW TOP VIEW 1 2 RIGID COPPER PIPE UNDER BASE COLD SUPPLY 1 1 2 TILE FLANGE HOT SUPPLY MINIMUM WATER PRESSURE FOR THE SYSTEM IS 4...

Page 6: ...T CURVED GLASS WALL MOUNTING POST TOWER WITH PLUMBING FIXTURES MAGNETIC GASKET BOTTOM PLATE AND TOP COVER PREASSEMBLED GLAZING GASKET 3 TOWER MOUNTING BOLT WASHER CURVED GLASS FRONT RAIL GLASS PANEL S...

Page 7: ...of a joint or splice of subfloor should be level to each other Level and support waste pipe cutout area greater than 5 x 5 The base is NOT to be supported by the tile flange INSTALLATION INSTRUCTIONS...

Page 8: ...xcluded from the Jacuzzi Whirlpool Bath warranty Replace the strainer and tape over the drain hole to prevent finishing material from entering drain STEP 4 With the drain fitting passing over the cent...

Page 9: ...aling the tile grout will prevent this leakage CLEAN UP AFTER INSTALLATION To avoid dulling and scratching the acrylic surface of the base never use abrasive cleaners A mild liquid detergent and warm...

Page 10: ...heads STEP 3A Slide straight glass panel all the way into wall post Mark position of glass post Remove panel 2 WALL TOWER FIXED WALL AND CURVED GLASS INSTALLATION TAPE 6 PLACES FINISH WALL 3 4 19 mm E...

Page 11: ...e of the tower 2 WALL TOWER FIXED WALL AND CURVED GLASS INSTALLATION NOTCH WASHER BOLT 5 16 GLAZING CHANNEL GLASS PANEL SUPPORT RAIL TOWER SUPPORT RAIL STEP 7 Insertsupportrailsintobracketsintopmouldi...

Page 12: ...ith a 3 16 bit and secure bracket with screws and wall anchors provided STEP 10 Adjust the rails until tower is vertical in 2 planes 2 WALL TOWER FIXED WALL AND CURVED GLASS INSTALLATION STEP 12 Tight...

Page 13: ...port rail Screw M3 5X9 5 mm screw into hole STEP 14 Install cover cap on fixed glass wall post STEP 15 Install glazing gasket on curved glass wall post on the outside Note orientation of gasket Soapy...

Page 14: ...n Insert cover at top first STEP 18 Seal all around the base of tower with silicone sealant Also seal the inside of both wall posts glass post and the bottom of both glass panels on the inside only TO...

Page 15: ...zi Whirlpool Bath s responsibility for shipping damage ceases upon delivery of the products in good order to the carrier Refer any claims for damage to the carrier For definitions of warranty coverage...

Page 16: ...L ROUGH IN REFERENCE 60 42 5 16 33 3 4 27 15 16 84 23 21 1 2 FRONT VIEW TOP VIEW 1 2 RIGID COPPER PIPE UNDER BASE COLD SUPPLY 1 1 2 TILE FLANGE HOT SUPPLY MINIMUM WATER PRESSURE FOR THE SYSTEM IS 40PS...

Page 17: ...D GLASS WALL MOUNTING POST TOWER WITH PLUMBING FIXTURES MAGNETIC GASKET BOTTOM PLATE AND TOP COVER PREASSEMBLED TOWER MOUNTING BOLT WASHER CURVED GLASS GLAZING GASKET 2 FRONT RAIL BRACKET COVER 2 WALL...

Page 18: ...ve the stainless steel strainer from the drain assembly Disassemble the locknut and two gaskets from the back of the drain assembly Apply a 1 4 bead ofcaulking silicone tothedrainholeandinsertthedrain...

Page 19: ...ng drain STEP 4 With the drain fitting passing over the center of the drainpipe lower the shower base carefully into place push down firmly until the base is in place You must check the level of the b...

Page 20: ...d or blocking shims MUST be used to prevent distortion or cracking of the flange STUD CEMENT BOARD 1 4 MINIMUM GAP SILICONE SEALANT TILE TILE ADHESIVE 1 4 MINIMUM GAP SILICONE SEALANT STUD CEMENT BOAR...

Page 21: ...lesandsecure with wall anchors and screws provided Cut a 12 strip of tape provided and apply firmly over screw heads FINISH WALL 3 4 19 mm TAPE 3 PLACES STEP 3 Slide the glass panel into the wall post...

Page 22: ...MOUNTING BRACKET MOUNTING BRACKET COVER RAIL STEP 7 Place the front rail and tower support rail against the walls Check level and mark the position for the rail mounting bracket The screw position wi...

Page 23: ...supply lines when connecting SHUT OFF VALVES PROVIDED COLD HOT BOLT STEP 11 Install cover cap on wall post STEP 12 Install glazing gasket on curved glass wall post on the outside Note orientation of g...

Page 24: ...ED GLASS INSTALLATION TOWER COVER INSERT THIS SIDE FIRST TOWER COVER TOWER TOP PLATE STEP 15 Seal all around the base of tower with silicone sealant Also seal the inside of both wall posts bottom of b...

Page 25: ...ed to change the direction of the spray Diverter Control To turn On water turn the inner knob clockwise and adjust for more or less flow The outer knob will divert the water to body sprays shower head...

Page 26: ...and remove filter from the hose Clean any debris Reinstallation is the reverse of removal Turn on hot and cold supply and check for leaks Printed in U S A 2002 Jacuzzi Whirlpool Bath U223000 8 13 04 P...

Page 27: ...hick 9 G432000 Nipple 1 2 Close 10 U217827 Shower Head Chrome 11 U215827 Jet Wall Body Chrome 12 U219827 Face Plate Transfer Valve Chrome 13 U546827 Nut Transfer Valve Chrome 14 U545827 Collar Transfe...

Page 28: ...11 U827000 2X Ball Valve 5 FTP X 5 MPT L 12 U421000 11X Washer FTG 7 OD 13 U401000 7X FTG Ell 1 2 FST X 10mm Barb 14 U405000 L 4 5 Tubing PVC Reinforced 10mm Barb 15 U404000 2X FTG Y 10mm X 10mm X 10...

Page 29: ...00 Glass Panel Front Wlak in 13 U354000 Screw Self Tap 8 X 1 25 L 14 U703000 Anchor 6 8 10 15 5374832 Screw Sheet Metal PHP 6 X 88 L 16 U196000 Bracket Corner Post Bottom 17 3952832 Bolt Hex FL Thrd 5...

Page 30: ...0 U159000 Gasket Vinyl Glass Panel 11 J686000 Tape High Bond 2 Sided 12 U354000 Screw Self Tap 8 1 25 L 13 U703000 Anchor 6 8 10 14 3952832 Bolt Full Thread 5 16 15 3983832 Washer 5 16 Flat Type 2 Pln...

Page 31: ...ESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES or losses arising from any cause e g water damage to carpet ceiling loss of use etc including its own negligence damages to respecting or resulting f...

Page 32: ...as TX 75370 2168 Call 800 288 4002 To obtain warranty replacement for factory installed components for Company supplied options and accessories manufactured and supplied by the Company call or write t...

Reviews:

Related manuals for Summer Rain 2 Wall and 3 Wall