background image

Jacuzzi Whirlpool Bath: Shower Towers 

Page 1 

FZ71000B • 09/07

.  Connect 1/" hoses from the front plate (1) marked in red and blue to 

the hot and cold water supply’s, respectively, as shown in Figure 7.

NOTE

: do not bend or kink the hoses 

when installing. Tighten fittings with a 

wrench and test for leaks.

3.  align the three mounting holes of the back 

housing (5) and front plate (1) with the three 

mounting rods (7) on wall. Fasten the front 

plate to the fixing rods and attach with  the 

washers (9) and cap screws (10) provided.

NOTE

: Figure 8 shows the hot and cold supply 

locations.

RED AND BLUE WATER SUPPLY LINES

Onda

Ovale

Metallo

10

5

9

7

5

10

7

9

Figure 7

7

BLUE HOSE

RED HOSE

HOT WATER 

SUPPLY

COLD WATER 

SUPPLY

(1/" nPT 

Thread)

Place supply lines

within hatched region

11.00"

6.5"

Place supply lines

within hatched region

Place supply 

lines

within hatched 

region

6.5"

18.50"

6.5"

.00"

.00"

3.50"

Figure 8

Summary of Contents for ONDA EC31000

Page 1: ...er Leave this manual for homeowner Homeowner Read this manual and keep for future reference Save These Instructions for Future Use Complete and mail in the product registration card provided with your...

Page 2: ...________ Purchased From_____________________________________________________________ Installed By_________________________________________________________________ Model_ ______________________________...

Page 3: ...5 bar Maximum Working Water Pressure 72 52 psi 5 0 bar Recommended Working Water Pressure 43 51 psi 3 0 bar Maximum Working Water Temp 140 158 F 60 70 C Minimum Working Water Temp 41 68 F 5 20 C Recom...

Page 4: ...5 bar Maximum Working Water Pressure 72 52 psi 5 0 bar Recommended Working Water Pressure 43 51 psi 3 0 bar Maximum Working Water Temp 140 158 F 60 70 C Minimum Working Water Temp 41 68 F 5 20 C Recom...

Page 5: ...si 1 5 bar Maximum Working Water Pressure 72 52 psi 5 0 bar Recommended Working Water Pressure 43 51 psi 3 0 bar Maximum Working Water Temp 140 158 F 60 70 C Minimum Working Water Temp 41 68 F 5 20 C...

Page 6: ...ng Washer Brass nut 5 4 3 Included Included Body Jet Screw nut S S Flexible Hose Sealing Washer Threaded Connector 1 0b 6 1 1 1 Thermo Static Control Flow Control diverter 1 0c Square shaped Temperatu...

Page 7: ...Washer Threaded Connector 1 0b 6 1 1 1 Thermo Static Control Flow Control diverter 1 0c Square shaped Temperature Check Spout 1 glass Shelf With Pillar Included 1 18 1 3 5 1 Included Included Included...

Page 8: ...w Included Connection rod 1 Included Hanger Included 6 Screw Parts List The parts list table common to all Ristorre shower towers is located on Page 9 Please refer to this table for com ponent identif...

Page 9: ...ut m3 5X 5mm Screws Flow Control glass Shelf assembly Plastic anchors Hand Shower Square Temp Check Spout diverter Hand Shower Bracket Shower Flexible Hose 1 1 1 1 6 1 1 1 1 6 5 1 1 1 8 5 4 3 1 0c 6 7...

Page 10: ...he location of the hanger on the wall see Figure 3 Each unit arrives ready for installation completely equipped with plumbing and fittings Remove the unit from the carton Retain the shipping carton un...

Page 11: ...the front plate 1 see Figure 5 Insert the rings 27 and rubber washer 24 into the threaded end of the pillar of the glass shampoo platform 14 c Attach the glass shampoo platform 14 onto the front plat...

Page 12: ...ousing 5 and front plate 1 with the three mounting rods 7 on wall Fasten the front plate to the fixing rods and attach with the washers 9 and cap screws 10 provided NOTE Figure 8 shows the hot and col...

Page 13: ...ptional tube shaped temperature check spout 13 as an alternative to the pre installed square shaped temperature check spout 12 To exchange these two components use a hand wrench not sup plied to remov...

Page 14: ...nd Bath spout b Flow Control The Flow Control 4b is located in the center of the Control Valve and is used to control the water flow volume Increase the water flow by turning the handle to the left an...

Page 15: ...ng floods earthquakes etc In addition THE COMPANY WILL NOT BE RESPONSIBLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES or losses arising from any cause e g water damage to carpet ceiling loss of use etc in...

Page 16: ...ng in transit is the responsibility of the carrier The user or installer MUST open the crates and inspect the unit for damage when it is delivered If damage is discovered it must be reported immediate...

Reviews: