Jacuzzi Whirlpool Bath: Shower Towers
Page 1
FZ71000B • 09/07
. Connect 1/" hoses from the front plate (1) marked in red and blue to
the hot and cold water supply’s, respectively, as shown in Figure 7.
NOTE
: do not bend or kink the hoses
when installing. Tighten fittings with a
wrench and test for leaks.
3. align the three mounting holes of the back
housing (5) and front plate (1) with the three
mounting rods (7) on wall. Fasten the front
plate to the fixing rods and attach with the
washers (9) and cap screws (10) provided.
NOTE
: Figure 8 shows the hot and cold supply
locations.
RED AND BLUE WATER SUPPLY LINES
Onda
Ovale
Metallo
10
5
9
7
5
10
7
9
Figure 7
7
BLUE HOSE
RED HOSE
HOT WATER
SUPPLY
COLD WATER
SUPPLY
(1/" nPT
Thread)
Place supply lines
within hatched region
11.00"
6.5"
Place supply lines
within hatched region
Place supply
lines
within hatched
region
6.5"
18.50"
6.5"
.00"
.00"
3.50"
Figure 8