12
ILLUSTRATION 9 (LEFT HAND SHOWN)
1. Locate the drilling template. Place it over the bathtub. The inner orange circle must be centered over the
circular opening of the bathtub. (See Illustration 9.) Be sure the orange circle is spaced an equal distance
around the bath cavity. The line marked back wall and side wall must be parallel with each wall. Make sure
that the template lies flat. Using a sharp center punch, lightly tap through the template hole center location
marks onto the bath surface. Remove the template.
2. Drill three (2) 5/16" diameter holes for the tower and (5) 3/16" holes for the bottom rail.
IMPORTANT: THE HOLES MUST BE DRILLED AS ACCURATELY AS POSSIBLE TO INSURE PROPER
INSTALLATION AND OPERATION OF THE SHOWER DOOR.
TOWER INSTALLATION
BACKWALL
BACKWALL
SIDEW
ALL
SIDEW
ALL
5/16" HOLE (3)
TAPE FIRMLY
(TYP)
INNER ORANGE CIRCLE
EQUAL DISTANCE
AROUND DIAMETER OF
BATHTUB
CUT OUT AS
REQUIRED
(5) 3/16"
HOLE
Summary of Contents for J-SHOWER TOWER ENCLOSURE-Siena
Page 1: ...WHIRLPOOL BATH R INSTALLATION AND OPERATING MANUAL J SHOWER TOWER ENCLOSURE Siena Merano...
Page 2: ......
Page 25: ......
Page 26: ......
Page 27: ......