3
ASSEMBLY INSTRUCTIONS
Loosen the set screw (1) pre-assembled to the
spout (2), rotate the spout (2) about 90° to align
handle (3), then tighten the screw.
Place the escutcheon (1) over the standpipe (2)
and then push it to the base.
Place the assembly with the flexible supply lines (1)
through the prepared hole. Then holding the
escutcheon (2), secure the standpipe (3).
Note: If mounting into wooden floor, secure the
standpipe (3) using screws (4) only (wall plugs are
not needed). If mounting into solid floor, mark the
position of holes first and then secure the standpipe
(3) using anchors (5) and screws (4). Where requried
ensure correct anchors for your floor type are used.
Connect one end of the shower hose (1) to the mixer
(2) and the other end to the hand shower (3). Ensure
the washer (4) is in each end for seal.
2
3
1
2
1
1
2
1
2
2
3
Floor
Floor
Screw the standpipe (1) onto the mixer (2) by hand.
Turn in a clockwise direction until it is tight.
Note 1: Do not to reverse the cold and hot supply lines.
Note 2: After installing the standpipe (1), the inlet supply
lines will be exposed 12 in. below the standpipe. Please
pay attention to set aside enough space to connect the
water supply lines and prevent the water inlet supply
lines from twisting.
4
2
1
5
1
2
5
3
4
6
1
2
4
3
4
Front
Hot inlet supply line
Cold inlet supply line
1/4 in. dia.
Drill a hole 2 1/4 in. diameter min. - 2 9/16 in. diameter
max. in the floor with an electric drill (1). Mark the
locations for the screws with a pencil (2). Then drill
three holes 1/4 in. diameter for the screws in the floor
with an electric drill (1).
30
5.
0m
m
[
12
"
]