Connect
chemical
hoses from
each boom
each boom
section to the
ends of the
t
center
section.
Tighten using
g
g
the hose
clamp.
Fold over the outer boom segment, then
rotate the boom backward and up to the
rotate the boom backward and up to the
mounting