Delta 5 Installation & Operation Manual 7610-003-37-08
Issued: 05-25-2007 Revised: 03-08-2013
SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
ELECTRICAL INSTALLATION INSTRUCTIONS
6
ELECTRICAL POWER CONNECTION:
Electrical and grounding connections must comply with all applicable portions of the
National Electric Code (ANSI/NFPA 70) and/or other electrical codes that may apply.
Disconnect the electrical power supply and lockout the disconnect switch to indicate that you are working on the circuit.
The dishmachine data plate is located on the left front corner of the machine. Refer to this data plate for information concern-
ing the unit’s specific electrical requirements.
To install the incoming power lines, open the connection box by removing the con-
nection box lid. Install 1/2” conduit into the pre-punched holes in the back of the con-
nection box. Route the power wires and connect to the power block and grounding
lug. Install the service wires (L1 and N) to the appropriate terminals as they are
marked on the terminal block. Install the grounding wire into the lug provided. Wires
should be firmly secured in place.
It is recommended that “De-Ox” or another similar anti-oxidation agent be used on
all voltage connections.
VOLTAGE CHECK:
Ensure that the machine is off and apply power to the machine.
Check the incoming power at the terminal block and ensure it corresponds to the
voltage on the machine data plate. Do not run the dishmachine if the voltage is too
high or too low. Shut off the service breaker and mark it as being for the dishma-
chine. Advise all personnel of the location of the service breaker. Replace all covers
and tighten the screws.
NOTE: Always refer to the machine data plate for specific electrical and water requirements. The material provided on
this page is for reference only and may be subject to change without notice.
Ground Lug
Power Block
Summary of Contents for Delta 5 D
Page 7: ...1 SECTION 1 SPECIFICATION INFORMATION ...
Page 10: ...4 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS ...
Page 18: ...12 SECTION 3 PREVENTATIVE MAINTENANCE ...
Page 20: ...14 SECTION 4 TROUBLESHOOTING ...
Page 23: ...17 SECTION 5 PARTS SECTION ...
Page 43: ...37 SECTION 6 ELECTRICAL SCHEMATICS ...
Page 45: ...39 SECTION 7 JACKSON MAINTENANCE REPAIR CENTERS ...
Page 52: ......