REV 12-28-2018
6
Typical in-bay installation with boom
(cutting hose is mandatory when using boom).
When no boom is used, simply locate hose hanger under Turbo Towel unit. Note
blower must be mounted with motor axis horizontal never vertical.
Instruction sign can be
installed anywhere in bay.
Optional 18000-HH hose
hanger can be installed
near boom “home
position” against wall.
Optional 18000-NH
nozzle holder can
be installed near
boom “home
position” against
wall.
Turbo Towel unit is
typically installed
high in the bay, but
underneath of
boom if using
boom. It can be
installed to the left
or right of boom
(right example
shown).
Hose joining
boom and Turbo
Towel should be
relaxed and not
taut.
Boom is typically installed
above Turbo Towel unit so it
does not hit the cover of Turbo
Towel when being used.
TYPICAL INSTALLATION
Summary of Contents for Turbo Towel 18500
Page 5: ...REV 12 28 2018 5 PRODUCT DIMENSIONS ...
Page 16: ...REV 12 28 2018 16 Troubleshooting 120V example ...
Page 17: ...REV 12 28 2018 17 ...
Page 18: ...REV 12 28 2018 18 ...
Page 19: ...REV 12 28 2018 19 ...
Page 20: ...REV 12 28 2018 20 ...
Page 21: ...REV 12 28 2018 21 ...
Page 22: ...REV 12 28 2018 22 ...