Precautions
a)
On the vehicle
Appropriate precautions must be taken to protect parts on which paint could be harmful to the conservation and operation
thereof:
●
hoses for pneumatic and hydraulic systems in rubber or plastic,
with particular reference to the braking system
;
●
gaskets, rubber or plastic parts;
●
propeller shaft and PTO flanges;
●
radiators;
●
suspension, hydraulic/pneumatic cylinder stems;
●
air vent valve (mechanical assembly, air tank, thermostarter preheat tanks, etc.)
●
sediment bowl and fuel filter assembly;
●
plates, codes.
If painting is required after wheels are removed, it is necessary to:
●
Protect the wheel rim mounting surfaces on the hubs and the contact areas of the locking lugs/wheel studs;
●
ensure adequate protection of brake discs.
The electronic components and modules must be removed.
b)
On engines and their electric and electronic components
Appropriate precautions must be taken to protect:
●
engine wiring and ground contacts;
●
the sensor/actuator side connectors and wiring side;
●
the sensors/actuators on the flywheel and on the flywheel rpm sensor mounting bracket;
●
pipes (plastic and metal) of the fuel circuit;
●
complete basic diesel filter;
●
the ECU and its base;
●
the entire internal part of the sound-proof cover (injectors, rails, pipes);
●
the common rail pump and its control valve;
●
the vehicle electric pump;
●
tank containers;
●
the front V-belts and relative pulleys;
●
the power steering pump and relative pipes.
Note
When the painting operation has been completed, and prior to oven drying (max. temperature 80
°
C), all parts which may be
damaged by exposure to heat, must be removed or protected.
Summary of Contents for DAILY 4x4 2020
Page 3: ...Printed 692 68 999 3 Ed Base 08 2020 UPDATE DATA Section Chapter Description Revision date...
Page 6: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 7: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 1 GENERAL INFORMATION...
Page 8: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 25: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 2 CHASSIS INTERVENTIONS...
Page 26: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 71: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Page 72: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 99: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 4 POWER TAKE OFFS...
Page 100: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 102: ...4 DAILY 4x4 GUIDELINES FOR BODYBUILDERS POWER TAKE OFFS Printed 692 68 999 3 Ed Base 08 2020...
Page 108: ...10 DAILY 4x4 GUIDELINES FOR BODYBUILDERS POWER TAKE OFFS Printed 692 68 999 3 Ed Base 08 2020...
Page 109: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 5 ELECTRONIC SUB SYSTEMS...
Page 110: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 155: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 6 ADBLUE AND SCRT SYSTEM...
Page 156: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 163: ...Printed 692 68 999 3 Ed Base 08 2020 SECTION 7 EXPANSION MODULE...
Page 164: ...Printed 692 68 999 3 Ed Base 08 2020...
Page 166: ...4 DAILY 4x4 GUIDELINES FOR BODYBUILDERS EXPANSION MODULE Printed 692 68 999 3 Ed Base 08 2020...
Page 173: ...Printed 692 68 999 3 Ed Base 08 2020 APPENDIX C Hi MATIC AUTOMATIC GEARBOX...