Examples
Figure 2: Example of proper lifting method using lifting lugs
2.4 Pump storage requirements
Requirements
Submersible units require proper preparation for storage and regular maintenance during storage. The
unit is considered in storage when it has been delivered to the job site and is awaiting installation.
For specific requirements for storing motors, gearboxes, engines, panels, sealing plans and other auxilia-
ries, contact the equipment manufacturer.
Storage preparation
Condition
Proper preparation
Indoor storage area (preferred)
•
Pave the area.
•
Clean the area.
2.4 Pump storage requirements
HSUL Installation, Operation, and Maintenance Manual
11