STEP BY STEP ASSEMBLY
STEP 1
Lay out all Posts & components
W
O
R
L
D
W
ID
E
©
C
O
P
Y
R
IG
H
T
2
0
1
6
IT
S
A
G
O
A
L
P
O
S
T
S
L
T
D
,
A
L
L
R
IG
H
T
S
R
E
S
E
R
V
E
D
A
R
E
G
IS
T
E
R
E
D
D
E
S
IG
N
UPRIGHT
SECTION
1886mm
P
Q
O
N
L
M
CROSSBAR SECTION
BACKBAR
SECTION
2970mm
SIDEBAR
SECTION
1450mm
TOP
STANCHION
TUBE
400mm
BACK STANCHION TUBE
2065mm
K
STEP 2
Insert Blanking Cap part
C
and
insert Large Quick Release Button
H
(x2)
into Corner Bracket
X.
(NOTE: CornerBracket
X
is different from Corner Bracket
A
. Corner
Bracket X is to be fitted into the upright posts
and has 8 holes.
STEP 3
Insert Small Quick Release Black Button
I
into the Spigot
B
. Insert Spigot B and
insert
H
(x2) into Corner Bracket
A.
(NOTE: Corner Bracket
A
has 4 holes)
STEP 4
Insert Arrow Head Net Fixings
K
into Upright Posts and Crossbar.
DO NOT THROW AWAY
LOCKING PINS
STEP 5
Insert Ground Frame net Fixings
NH
into Back bar and Side bar. see details
about removing burrs overleaf.
DO NOT THROW AWAY
LOCKING PINS
AX
C
H
C O R N E R
BRACKET
H
A
C O R N E R
BRACKET
SPIGOT
B
I
NH
FOR EASIER ASSEMBLY
Use a rubber mallet and also spray furniture polish inside posts. Do not use a metal hammer. Do not apply grease or vaseline.
STEP 6
Insert Corner Brackets
AX
into the
upright posts
O
(uprights have logos on the side)
STEP 7
Insert Corner Brackets
A
into
each end of the crossbar L
STEP 8
Fit
G
and insert Corner Brackets
A
into each end of the Backbar
M
STEP 9
Attach Side bars
N
to
the ground back bar by slotting
into the corners brackets
STEP 10
Attach Upright
O
to
the Side bars
N
STEP 11
Attach Crossbar
L
to uprights
O
L
O
AX
A
A
L
M
G
STEP 12
Join top tubes
P
to elbows
F
and back tubes
Q
and connect
to the goalpost
.
STEP 13
Attach Ground Anchors
see details of use overleaf.
P
F
Q
STEP 14
Attach The Net to the
Net Fixings. Start with
each corner
TIE A CORD
BETWEEN THE
TOP SUPPORT TUBES TO
SUPPORT THE ROOF OF THE
NET (THIS CAN BE LEFT TIED
IN POSITION WHEN DISMANTLED)
The goal net can
be left attached to the
pre-assembled goal post
side frames. After games
detach crossbar and back bar
for storage. We advise fitting the
optional net ties to the side frames and stanchions.
ASSEMBLY & DISASSEMBLY
FASTER
MATCH DAY
ANCHORING YOUR GOAL ON GRASS
- POSITION YOUR GOAL ON A LEVEL PLAYING SURFACE.
PLACE THE MULTI-SURFACE ANCHOR OVER EACH SIDE OF THE GROUND FRAME (POSITIONS
SHOWN) HAMMER THE PEGS DOWN UNDER THE FRAME INTO THE GRASS. ADDITIONAL
ANCHORS OR LARGER PEGS CAN BE PURCHASED FOR USE ON SOFT GROUND OR SAND. THESE
ANCHORS CAN BE USED FOR HARD SURFACES, SUCH AS TARMAC BY USING BOLTS THROUGH
THE MULTI SURFACE ANCHORS INTO CONCRETE PADS. COUNTER BALANCE WEIGHTS CAN ALSO
BE USED (SUPPLIED SEPARATELY). CHAINS ARE AVAILABLE SEPARATELY THAT CAN BE USED TO
SECURE GOALS TO SEPARATE ANCHOR POINTS.
PEG
REMOV
AL
a
b
a
b
OPTIONAL - Net ties are ideal to fit nets tightly to the side ground frames and
stanchions. This is ideally when nets are left attached to the fully assembled side
frames.
NH
OPTIONAL TIES
WORLDWIDE © COPYRIGHT 2001 ITSA GOAL POSTS LTS, ALL RIGHTS RESERVED A REGISTERED DESIGN