
ITS Partner O.B.S S.L · Av. Cerdanyola 79-81 Local C
08172 Sant Cugat del Vallés · Barcelona (Spain)
Phone: +34935839543 · [email protected] · www.ek.plus
4
USER MANUAL
ONT 2W
Interfaces and LEDs
Interfaces
1.
Ports: We will connect the end equipment (PC, SWITCH, printers, etc). We have a GE (Gigabit
Ethernet) port and another FE (Fast Ethernet).
2.
POTs: Port to connect analogy telephone terminal.
3.
Reset button: Button to perform factory reset. You should hold about 20 seconds to perform a
factory reset.
4.
Power: We will connect the 12v power supply cable.
5.
Power button: To turn the machine on or off.
6.
PON port (bottom of the equipment): We will connect the fiber cables that comes from the
installation.