ITOOLCO MC CART USER’S GUIDE
1608MC300UG
P a g e | 8
OPERATION
Operation
1.
Position spools to be lifted just in front of the legs as
shown (fig. 1)
2.
Remove solid axle from cart and slide through
center arbor of spools. (fig. 2)
3.
Tip cart forward and roll spools back into axle
saddle. (fig. 3)
4.
Return cart to vertical position and install hitch pins.
(fig. 4)
5.
Load Cable Mate onto Bolt-on Wire Bar as needed.
(fig. 5)
6.
Ensure all lynch pins and hitch pins are installed
before transporting wire.
7.
To transport, tip back and push the cushioned
handle bars. (fig. 6)
8.
Align loaded MC Cart with the direction of your pull.
CAUTION: DON’T TIP CART FORWARD WHEN THE
BOLTON WIRE BAR IS FULLY LOADED. FAILURE TO
OBSERVE THIS WARNING COULD RESULT IN SEVERE
INJURY OR DEATH.