background image

Earth

Safe

2.4

Warranty and liability

The “General Terms of Sale and Delivery” of the manufacturer or his authorised 

representative apply.

2.5

Product feedback

Please notify the manufacturer or his authorised representative about any of the 

following

Accidents

Potential safety hazards associated with the wind turbine system

Ambiguities in this translation of the original instructions

Description of the wind turbine system

3.1

Intended use

The wind turbine system may only be used as a “small wind turbine system” 

(SWTS) to generate power in accordance with EN 61400-2.

The wind turbine system may only be operated in accordance with the ratings 

and in the approved wind class (refer to the technical data). 

Observance of the original instructions and compliance with the maintenance 

and repair instructions are essential preconditions of use for the intended 

purpose.

3.2

Reasonably foreseeable misuse

All forms of use which deviate from or exceed the limits of use described above are 

considered to be contrary to the intended purpose. The manufacturer is not liable 

for any damage resulting from such use.

No liability will be accepted by the manufacturer if the equipment has been altered 

as well as in the event of improper assembly, installation, start-up, operation, 

maintenance or repair.

Only original parts supplied by the manufacturer are approved as spare parts or 

accessories. Any spare parts or accessories not supplied by the manufacturer 

have not been tested for operation and could be detrimental to reliability. No 

liability will be accepted by the manufacturer for any damages which result from the 

use of non-approved spare parts or accessories.

Reasonably foreseeable misuse includes:

Operation outside the manufacturer’s specification

All modifications or changes to the wind turbine system without the 

manufacturer’s written approval!

Use of parts other than iSTA Breeze original parts.

Operation in non-approved SWTS classes.

Operation in strong winds or hurricanes.

3

                      - 

Technical 

D

escription

 -

6 of 2

8

Translation of the original instructions iSTA wind turbine system 

2

4

.0

7

.201

8

I00

Summary of Contents for i-1000 Series

Page 1: ...SAVE SAVE ENERGY PLANET TRANSLATION OF THE ORIGINAL INSTRUCTIONS Keep handy at the place of use Wind turbine system i 700 i 1000...

Page 2: ...ranslation of the original instructions 4 2 2 1 Other symbols used 5 2 2 2 Information 5 2 3 Name and address of the manufacturer and his authorised representative 5 2 4 Warranty and liability 6 2 5 P...

Page 3: ...ng down the Wind Turbine System 17 Translation of the original instructions iSTA wind turbine system 24 07 2018 I00 3 of 28 10 Maintenance 18 10 1 Safety precautions during maintenance work 18 10 2 In...

Page 4: ...turbine system 2 2 Conventions used in this translation of the original instructions Safety information is always identified by a signal word and in some cases also by a hazard specific symbol DANGER...

Page 5: ...ation Note Indicates general information and recommendations 2 3 Name and address of the manufacturer and his authorised representative Table 3 Manufacturer Table 4 Authorised representative Translati...

Page 6: ...the limits of use described above are considered to be contrary to the intended purpose The manufacturer is not liable for any damage resulting from such use No liability will be accepted by the manuf...

Page 7: ...Converts wind energy into electrical energy 2 Switch switch AC Emergency Stop Button optional optional Type i HCC 800 Charge controller 3 4 Battery optional Stores electrical energy Acid Gel Recommen...

Page 8: ...to the tower 1 Table 6 Main components of the wind turbine and their functions 5 2 1 3 4 6 7 4 1 Nose 1 2 Rotor blade 3 3 Hub for holding the blades 1 4 Generator for producing electricity 1 5 Boom f...

Page 9: ...0 110 48V 0 190 Approx weight per Rotor Blades 3 pieces of plastic with glass fiber mixture rotor blade g 620 720 Blade Color Black or White Direction of Rotation from the front in a clockwise direct...

Page 10: ...ty of the whole system especially the batteries The special features and product information are listed below Use of solid state components Increasing the life of the controller Microprocessor control...

Page 11: ...ns All work on the wind turbine system must be carried out by authorised persons Such persons must be familiar with the safety devices and regulations prior to carrying out the work Authorised persons...

Page 12: ...sufficient height refer to Fig 3 Obstacles are defined as houses hedges trees hills etc When choosing the place of use make sure adequate room is available to tilt the tower and blades if necessary H...

Page 13: ...size and structure of the foundation depend on the soil characteristics Recommendation Ask a qualified structural engineer for advice regarding the optimal design of the foundation Fig 5 Suitable guyi...

Page 14: ...process requires calm weather conditions Fig 6 Assembling the wind turbine 7 3 Unpacking the components 7 4 Assembling the wind turbine WARNING 5 1 4 2 3 6 3 For installation select sheltered place Ho...

Page 15: ...110 Cable cross section mm 2 5 4 6 10 16 25 Distance between generator and charge controller m 11 11 18 18 29 20 44 44 70 68 113 Cable cross section mm 2 5 4 6 10 16 25 Move rotor to Y position see Fi...

Page 16: ...efer to Fig 5 Remove the short circuit Fig 8 Connecting the three wire cable to the generato Pull heat shrink tubing over the solder joint and shrink Pull a suitable shrink tube over each wire of the...

Page 17: ...short circuited via the iSTA Breeze charge controller The wind turbine is braked Press the Charge controller OFF button on the iSTA Breeze charge controller Operation is interrupted Press the Charge c...

Page 18: ...Inspect for damage Wind turbine Check the bolts Electrical wiring Inspect the cables for damage Table 11Inspection and maintenance schedule WARNING Danger due to damaged parts Shut down the wind turbi...

Page 19: ...act the manufacturer or a specialist dealer Battery defective Replace the battery Battery too small Use a larger battery at least 100 Ah Battery fuse tripped Replace the fuse Check the electrical conn...

Page 20: ...the tower On the ground Detach the rotor blades from the generator Detach the generator from the tower and disconnect the electrical wiring Where necessary dispose of the individual components in cons...

Page 21: ......

Page 22: ...section 15 19 Charge controller 7 10 15 17 19 20 Foundation 13 19 Load 10 13 20 Main components Place of use 11 12 Strain relief Tail vane 8 Transformer 15 Wind classes 12 Rotor blade 8 9 14 15 18 19...

Page 23: ...EarthSafe 15 Notes 24 of 28 Translation of the original instructions iSTA wind turbine system 24 07 2018 I00...

Page 24: ...EarthSafe 16 Performance Charts Translation of the original instructions iSTA wind turbine system 24 07 2018 I00 25 of 28...

Page 25: ...EarthSafe 17 Certificates 26 of 28 Translation of the original instructions iSTA wind turbine system 24 07 2018 I00...

Page 26: ...4x60 Ah Max 4x75 Ah Min 2x150 Ah Max 2x200 Ah Min 4x75 Ah Max 4x100 Ah Min 4x150 Ah Max 4x200 Ah i 1500 24V Min 2x200 Ah Max 2x250 Ah i 700 48V Wind Turbine Model Suitable Battery Capacities SUITABLE...

Page 27: ...lation of the original instructions iSTA wind turbine system 24 07 2018 I00 Fast Trading LTD Ul Stanc onna No 64 Et 2 BG 8500 Aytos BULGARIA 359 87 7819900 www istabreeze com ISTA Breeze No part of th...

Reviews:

Related manuals for i-1000 Series