Page 8 of 22
ITS-90 Isothermal Towers Iss.07 – 05/14
UNPACKING AND INITIAL INSPECTION
Our Packing Department uses custom designed packaging to send out your unit, but as accidents can still happen in
transit, you are advised, after unpacking the unit, to inspect it for any sign of shipping damage, and confirm that your
delivery is in accordance with the packing note. If you find any damage or that part of the delivery is missing you must
notify us or our agent, and the carrier immediately. If the unit is damaged you should keep the packing for possible
insurance assessment.
Electricity Supply
Before connecting to the electricity supply please familiarise yourself with the parts of the manual relevant to your
model.
Your unit's supply voltage requirement is specified on a plate on the instrument along with the serial number. All
instruments will work on an electricity supply frequency of 50Hz or 60Hz.
The apparatus is provided with an approved power cord. If the plug is not suitable for your location then the plug
should be removed and replaced with an appropriate plug.
Take care to ensure the old plug is disposed safely.
The cable is colour coded as follows:
COLOUR
FUNCTION
Green/yellow
Earth (Ground)
Brown
Live (line)
Blue
Neutral
Please ensure that your unit is correctly connected to the electricity supply.
THE APPARATUS MUST BE CORRECTLY EARTHED (GROUNDED)
The units’ on/off switch is located on the power inlet. Take care NOT to switch the unit off when it is hot - allow to
cool first.