![iSi Scottsdale Vertex SCM Series Installation And Assembly Instructions Download Page 3](http://html1.mh-extra.com/html/isi/scottsdale-vertex-scm-series/scottsdale-vertex-scm-series_installation-and-assembly-instructions_2092838003.webp)
Tools Required:
• 5/16” socket
• Drive extension
(recommended)
LSI Industries Inc.
10000 Alliance Rd. Cincinnati, OH 45242 • www.lsicorp.com
(513) 372-3200 • ©2020 LSI Industries Inc. All Rights Reserved. Specifications subject to change without notice.
Page
3/9
Part#
793286
Rev.
12/15/22
Scottsdale Vertex (SCV) & SCM Series
Installation and Assembly Instructions
STEP 1: UNPACK LUMINAIRE
• Remove luminaire from carton and make sure to review luminaire labels and electrical data.
• Make sure the input voltage rating matches available supply voltage.
• Make sure supply power is turned
OFF
prior to Installation. Installing with live supply voltage can damage electronics and
void fixture warranty.
WARNING!
Disregarding this information could result in electrical shock and/
or possible injury to individual installing or servicing this luminaire. Before
Installation, read as follows:
Delivery:
Upon receipt of Luminaire, REDiMount and Locking Collar (packed
individually), inspect thoroughly for any damage or missing parts. Make sure
that the catalogue nomenclature on packing slip matches the product label.
WARNING!
Do not install damaged product. Any damaged or broken
component during or after assembly should be replaced.
• Place locking collar aside for later assembly.
REDiMount
Luminaire
Locking Collar
(4) Plugs
(4) Self-Drilling
Screws, #10
Hex-head
(4) Collar
Screws, #10
Hex-head
SCV/SCM
REDiMount
Installation
Guide