background image

Unpack & Inspect

1

You should have:
•   1 Radiator
•  4 Wall bracket sleeves & 4 grub screws (attached to radiator)
•  1 Airvent with Chrome Cap (pre-installed) 
•  1 Blanking Plug with Chrome Cap (pre-installed) 
•  Wall fixings; these are not suitable for wall types.  
   

         Please use suitable fixings for your wall type.  

You will need:
•  Tape measure
•  Electric drill and bits
•  Spirit level
•  Crosshead screwdriver

Contents

2

Hang Radiator

3

Diagrams of Lynx

The Radiator Company prides itself on selecting products from 
manufacturers who exercise tight quality control measures.  
 
We only select models with excellent standards of welding and 
brazing, as well as high quality finishes. 

All of our products are well packaged and should reach you in 
perfect condition. Just in case however, we offer a 10-year no 
quibble guarantee on this product. 

The Radiator Company must be notified of any shortages or 
damage within 28 days of delivery.  
 

PLEASE NOTE : 

It is essential that all brackets are level to ensure a 

vertical alignment for connecting the pipework.

Pipe Centres

Pipe centres left to right

Pipe centres from wall

Depth from wall

Commission

4

Please Note: 

In accordance with Part L1 2006 of the Building Regulations and 

BS7593:1992 code of practice for the treatment of hot water 

and central heating systems, we strongly recommend flushing 

the heating system post installation of new radiators and then 

adding the correct quantity and type of inhibitor for use with 

your radiator and system to prevent corrosion. Damage caused to 

systems not protected by a suitable inhibitor will not be covered by 

manufacturer’s guarantee. 

430mm / width minus 70mm

55mm to 80mm

95mm to 120mm

For further information please see 
terms and conditions on back page.

430

95 to 120

55 to 80

500

430

min. 110

     Slide on the bracket sleeves over the 
top two bracket studs on the back of 
the radiator. 

Lift the radiator in its final desired place 
and mark the position of the bracket.

      Carefully set the radiator aside and 
hold the top two bracket sleeves to the 
wall on the markings, and mark through 
the centre of the bracket for drilling. 

Use a spirit level to check the markings 
are horizontally aligned. 

      Using suitable drill bits, plugs and 
screws, loosely fix the top two brackets 
to the markings. Check the position 
by placing the radiator in position. If 
correct, securely tighten the bracket 
sleeves to the wall.  
 
      With the top two brackets fixed, lift 
the radiator into position on the top 
two brackets (please ensure sufficient 
support is given to the radiator at all 
times)  
 
Mark the position for the bottom two 
brackets then repeat steps 1 to 3. 

      With all 4 bracket sleeves securely 
attached to the wall, hang the radiator 
and secure with the provided grub 
screws into the side of the bracket 
sleeves. 

1.

2.

3.

5.

1.

2.

3.

4.

5.

Reviews: