
29
For Concrete Ground Installation:
l
If the swing set is set up on grounds with sandy soil, it must be anchored with concrete footing
(concrete not included).
l
Dig holes around swing leg tube as shown below in drawing. As you dig down and create a
cylindrical hole, you should use a shovel to carve out the lower part of the hole, to create a larger
diameter hole at the bottom.
l
Place 2 inch high brick or 2 inches of gravel bed as shown in drawing below.
l
Use about 45lb of concrete per leg.
l
Cover concrete with dirt and protective surface material.
l
Allow about 6-7 days for concrete to dry properly.
Note: The maximum fall height for this product is 6 feet. The minimum ground
clearance between the bottom of the suspended plays and the playing or ground
service must be 8 inches.
Brick or gravel bed
1.
97
inches
12.6 inches
Concrete
Frame Leg
5
inches
8”
Must keep a minimum 8 inches of space with the soil.
Summary of Contents for 8101
Page 17: ...16 OVERVIEW DRAWING ...