STEP 2 (See Diagram 2)
A.) Attach the Main Base Frame (#2) and the Rear Base (#18) to the bottom of the Rear Vertical
Beam (#4). Align the holes and secure them together with two M10 x 3” Carriage Bolts (#105),
Ø ¾” Washers (#118), and M10 Aircraft Nuts (#125). Do not tighten the nuts and bolts yet.
B.) Attach two Pulleys (#84) to the top & bottom open brackets on the Rear Vertical Beam (#4).
Secure each Pulley with one M10 x 1 ¾” Allen Bolt (#101), two Ø ¾” Washers (#118), and one
M10 Aircraft Nut (#125).
C.) Push two Stabilizer End Caps (#86) onto each end of the base on the Rear Vertical Beam. After
completing the entire assembling of the machine, check the stability. If the base was not
leveled, adjust the M10 x 1” Socket Cap Screws (#109) on the Caps to level the base.
8
Summary of Contents for IGS 16
Page 4: ...HARDWARE PACK 3 ...
Page 5: ...HARDWARE PACK 4 ...
Page 6: ...HARDWARE PACK 5 ...
Page 7: ...HARDWARE PACK 6 ...
Page 21: ...DIAGRAM 13 20 ...
Page 23: ...DIAGRAM 14 22 ...
Page 25: ...DIAGRAM 15 24 ...
Page 29: ...28 ...