ASSEMBLY
STEP 7
Align M1 top to M2 desk. Screw
in (6) lag bolts into each leg and
(4) lag bolts into each side of
divider screen on the underside
of M1 top.
M2
M1
DS1
2
1
Screw in lag bolts into
divider screen and shared legs
on each side with #3 square drive.
1
STEP 8
Flip Leg 3 upside down and screw in
(2) leveling feet.
STEP 9
Flip leg 3 to an upright position.
Align support bar to in between tabbed legs.
Secure but do not tighten support bar with
(2) screen bolts and (2) screen nuts.
3
3
SB