IQAir ID-2530 Perfect 16 Installation Manual Download Page 7

Commercial Installation Examples

Page 7

Supply Duct

The Perfect 16 can be installed on supply ducts, provided the airflow of the duct is 2000 cfm or less. Balance
volume dampers and/or registers as necessary.

clean air out

dirty air in

Before Supply Plenum

In installations of 2000 cfm (5 tons) or less, the Perfect 16 can be installed before the Supply Plenum.
Note: The Perfect 16 is designed to sustain a maximum of 149°F (65°C).

Supply Duct Branch

The Perfect 16 can be installed on supply duct branches, provided the airflow to the branch is 2000 cfm or
less. Balance volume dampers and/or registers as necessary.

Summary of Contents for ID-2530 Perfect 16

Page 1: ...IQAir Perfect 16 ID Series MERV16 Micro Particle Filtration System Perfect 16 Installation Manual...

Page 2: ...Ultra efficient MERV16 certified ASHRAE 52 2 Low air resistance 0 22 w c 54 Pa at rated airflow Long filter life 3 years in average home use Quick and easy filter replacement No tools needed Easy inst...

Page 3: ...ata ID 2225 ID 2530 Minimum Ef ciency Reporting Value MERV MERV 16 492 fpm 2 5m s MERV 16 492 fpm 2 5 m s Rated air ow 1400 cfm 2380 m3 h 2000 cfm 3400 m3 h Composite Average Ef ciency E1 0 3 1 0 m 96...

Page 4: ...dove tail collar for the ID 2225 and 20 for the ID 2530 for best performance 3 Determine the correct air inlet and air outlet side of the system The air inlet is marked with Cut this Panel for Duct Co...

Page 5: ...system is installed vertically and return air enters the furnace side inlet 5 ton application Up Flow Furnace Filter system is installed horizontally beneath the furnace Return air enters from the bot...

Page 6: ...2225 and 20 for the ID 2530 for best performance 3 Determine the correct air inlet and air outlet side of the system The air inlet is marked with Cut this Panel for Duct Connection DIRTY AIR IN The a...

Page 7: ...ary clean air out dirty air in Before Supply Plenum In installations of 2000 cfm 5 tons or less the Perfect 16 can be installed before the Supply Plenum Note The Perfect 16 is designed to sustain a ma...

Page 8: ...the panel for any round opening 3 Cut the panel and remove the inner part 4 Put the insulation under the panel and cut it around the opening 5 Remove the insulation again 6 Install the dove tail colla...

Page 9: ...collar and the panel and wait till it has dried 10 Put the insulation to the inner side of the panel and fix the insulation to the collar with a duct tape 11 Stick the tape tightly to the insulation...

Page 10: ...rews to tap through square connection panel 2b Side connection as pictured can be used for up to 4 ton appli cations For 5 ton applications use return base 3 Ensure that there is unobstructed access t...

Page 11: ...Insert new lters starting from the bottom 6 Ensure that you align the lters with the air ow arrows match ing the air ow arrows on the cabinet 7 Double check that all lters have been inserted correctly...

Page 12: ...rs Obvious defects must be communicated to the authorized IQAir Dealer Installer within 10 days of the purchase date To secure your warranty rights and prevent possible transport damage all products m...

Reviews: