Commercial Installation Examples
Page 7
Supply Duct
The Perfect 16 can be installed on supply ducts, provided the airflow of the duct is 2000 cfm or less. Balance
volume dampers and/or registers as necessary.
clean air out
dirty air in
Before Supply Plenum
In installations of 2000 cfm (5 tons) or less, the Perfect 16 can be installed before the Supply Plenum.
Note: The Perfect 16 is designed to sustain a maximum of 149°F (65°C).
Supply Duct Branch
The Perfect 16 can be installed on supply duct branches, provided the airflow to the branch is 2000 cfm or
less. Balance volume dampers and/or registers as necessary.