IQAir ID-2225 Installation Manual Download Page 9

Page 9

Cutting Round Openings into Panels with Hole Cutting Tool

9.

Seal the gap between the collar and the front of the panel using
duct sealant. Wait until it has dried. Water-based low VOC is
recommended, such as DP 1010.

10.

Put the insulation to the inner side of the panel and fix the
insulation to the collar with a duct tape.

11. 

Stick the tape tightly to the insulation. Slice or notch the tape
to secure it smoothly to a round opening.

12.

Attach the connection panel again to the Perfect 16 system,
using the supplied TX30 Stainless Steel Screws. The screws are
included with the panel.

13. 

Repeat for second duct connection panel.

14.

Dispose and recycle waste per local laws and regulations.

Summary of Contents for ID-2225

Page 1: ...Features High efficiency close to 100 removal of pollution particles 0 3 microns Low pressure drop 0 18 to 0 22 inch w g at rated airflow Low maintenance up to 3 year filter life Safe produces no ozo...

Page 2: ...ion Examples Page 7 Supply duct Supply duct branch Before supply plenum Cutting Round Openings into Panels with Hole Cutting Tool Page 8 Panel selection Insulation cutting Collar attachment Disassembl...

Page 3: ...een designed to provide the highest possible air cleaning rate at the lowest possible pressure drop for residential and commercial forced air systems HVAC Two models are available The ID 2225 is ideal...

Page 4: ...anel for Duct Connection DIRTY AIR IN The air outlet is marked with Cut this Panel for Duct Connection CLEAN AIR OUT Both panels will need to be cut for the proper fit of the ducting prior to installa...

Page 5: ...ilter system is installed vertically and return air enters the furnace side inlet 5 ton application Up Flow Furnace Filter system is installed horizontally beneath the furnace Return air enters from t...

Page 6: ...l filters and secure the cabinet via panel from inside to the air handler using sheet metal screws Ensure correct airflow direction when reinserting filters Refer to Filter Replacement instructions se...

Page 7: ...fect 16 is designed to sustain a maximum of 149 F 65 C Supply Duct Branch The Perfect16 can be installed on supply duct branches provided the airflow to the branch is 2000 cfm or less Balance volume d...

Page 8: ...t your transition Never cut a panel with a Swiss cross 4 Fit the insulation back into the panel Lay the panel on a hard protected surface Using a sharp blade cut the insulation along the panel opening...

Page 9: ...o the inner side of the panel and fix the insulation to the collar with a duct tape 11 Stick the tape tightly to the insulation Slice or notch the tape to secure it smoothly to a round opening 12 Atta...

Page 10: ...to the filter insertion slots 5 Rotate the frame so all four sides can be tapped out gradually If you try to remove the legs all at once you may damage the frame 6 Remove the top frame 7 The two fram...

Page 11: ...the filter access panel off until after all four filters are replaced 5 Make sure the filters are installed correctly by aligning the airflow arrows 6 Carefully insert each of the four filters 7 Inst...

Page 12: ...ycle used filters per local laws or regulations 5 Insert new filters starting from the bottom 6 Ensure that you align the filters with the airflow arrows matching the airflow arrows on the cabinet 7 D...

Page 13: ...9 30 months 0 30 76 0 38 96 33 months 0 33 82 0 41 103 36 months 0 36 89 0 44 110 Minimum Efficiency Reporting Data ID 2225 ID 2530 Minimum Efficiency Reporting Value MERV MERV 16 492 fpm 2 5m s MERV...

Page 14: ...m 8 a m 4 30 p m PST Monday Friday Call 1 888 560 1020 or visit www iqair com support To expedite your service request please have the following information ready when contacting us IQAir model item n...

Page 15: ...Page 15 Notes...

Page 16: ...www iqair com 208 04 01 01 130724_IQ_MA_P16_Installation_E 2013 The IQAir Group All rights reserved...

Reviews: