![IQ Gate Systems IntelliSwing IQ-500-S Installation And Instruction Manual Download Page 28](http://html1.mh-extra.com/html/iq-gate-systems/intelliswing-iq-500-s/intelliswing-iq-500-s_installation-and-instruction-manual_2089480028.webp)
28
Gate Won’t Close
Gate is in UL Entrapment
Blown Motor Fuse
Comm. lost to motor board
Over Current on 1,2 or 3
Edge command active
AUX IN active (Hold Open)
Force Delay set to low
“blinking” output from the Motor
board terminal DS-10
Survey the area surrounding the
gate – when clear, activate the UL-
Reset button / terminal
Check both motor board fuses
Verify communication via the
REC / XMIT LED’s
Check and remove shorts or over
voltages
Check edge for activation/failure
Verify AUX IN setting and
remove contact
Increase force delay time to at
least 0.5 seconds
Gate reverses when closing
Check all of the above causes
Check the display for a M-1 or M-
2 Close Force alert
Check the Display and all LED’s
Check all of the above solutions
Verify close force setting and
adjust if necessary
The IQ Control Board and operators are virtually maintenance free. However, every 6 months to 1 year, a
qualified service technician should inspect, test, and adjust the inherent safety sensor as well as the
batteries, chains, and grease the bearings. Also, all bolts and nuts should be tightened and checked for
wear. All external accessories should also be tested for proper operation and wiring compliance.
Manual Release: Rotate lever 180 Degrees
Summary of Contents for IntelliSwing IQ-500-S
Page 12: ...12 ...
Page 15: ...15 12 24 VDC Power Input Terminals Inductance Loop Terminals Input Power Ground Terminals ...
Page 29: ......