Product Description of BRT-108
Page 3 of 4
Shenzhen Asia Bright Industry co., Ltd., Building 10, Asia Industrial Park, Gangtou, Bantian, Shenzhen, China.
© 2015 All rights reserved. Subject to change without notices.
Step two:
Wiring according to the diagram and the labelled ports of the switch; and
Step three: Install the switch to the wall box using screws and put back the front plate.
Fig. 4
BRT-108 Installation Guide
BRT-108 Operation Guide:
Switch on/off the load: After BRT-108 is powered on, touching the button will turn on or
turn off the load respectively (If delay off function is activated, the load will be turned off
after 30 seconds).
When a load is turned on, the corresponding button will become brighter in blue.
Set up delay-off function: Use a screwdriver to pry off the front plate to access the dip
switches as shown in Fig.5. Switching the
first
dip switch to on will set up the switch for
delay-off operation.
The delay-off time is set at 30 seconds at factory. Please talk to our sales representative if
other customized settings are required.