For installers and professionals
- 12 -
2.2.3. Wiring & protecting devices and cable specification
Connect to appropriate power supply, the voltage should comply with the rated voltage
of the products.
Well earth the heat pump.
Wiring must be connected by a professional technician according to the circuit diagram.
Set breaker or fuse according to the local code (leakage operating current ≤ 30mA).
The layout of power cable and signal cable should be orderly and not affecting each
other.
1. How to connect to the terminal board
Step 1. Open the maintenance panel
IPS-600
Remove the screws
Open the front right panel and the internal
Connect the wire
Restore the internal panel and the front right
panel
Fix by screws