
II. Installation
A. Setup
1. Turn off all peripheral equipment such as heaters, chemical
feeders, and pumps.
2. Relieve pressure from the filtration system.
B. Tools
1. Cordless drill
2. 1/4” NPT Tap
3. 7/16” drill bit
4. Masonry drill bit and anchors, or other appropriate fasteners
5. 13/16” wrench or channel-lock pliers
C. Procedure
1. Location
a. Wall area with easy access
b. Within 8 feet of feeder
c. At least 10 feet from water edge
d. Close proximity to time clock
e. Within 6 feet of GFCI power source
2. Mounting
Note:
The controller and flow cell are factory mounted to the ABS
board for convenience.
a. Securely mount ABS mounting board with M720 controller
and flow cell on wall (vertical installation).
b. If applicable, securely attach the peristaltic pump with the
provided hardware.
11
M720 pH/ORP Controller Owner’s Manual