7
Page 1: ...ral instructions 3 Installation 4 Electrical connection 4 Water and drainage connection 4 Refrigerant connection 4 Testing 4 Technical specification 5 6 Thawing cabinet Tina 1200BU DOC NO ST0 91 82 02...
Page 2: ...2 Producer SteelTech i Alings s AB L rkv gen 4 SE 441 40 Alings s Sweden Phone 46 322 668930 Fax 46 322 10870 E mail info steeltech se www steeltech se...
Page 3: ...accordance with EU directives LVD 2006 95 EG EMC 2004 108 EG and is CE marked Safety instructions Switch off the power before attempting to rectify faults or operating failures in the cabinet Turn th...
Page 4: ...ust be oil resistant class H07RN F Once the machine has been connected and switched on you should check that the mains voltage does not fluctuate more than 10 from the rated voltage Water connection C...
Page 5: ...n pipe 22 Water connection DN15 G 1 2 int thread Electrical connection Drainage Inlet pipe 22 1 2 3 4 5 Display Target temperature 6 7 Selector switch Cleaning 0 Thawing Deliming tube 8 9 Display Cabi...
Page 6: ...Hz Cooling system Brine Brine Total Power kW 4 4 Compressor output kW _ _ Max phase current A 8 1 8 1 Productivity per cycle kg 150 150 Refrigerant _ _ Refrigerant weight g _ _ Cooling Power kW 1 5 1...
Page 7: ...7...