background image

IMPORTANT SAFEGUARDS

When using electrical equipment, basic safety precautions should always be followed, including the following:

READ AND FOLLOW ALL SAFETY INSTRUCTIONS

 1. 

CAUTION 

– To prevent electrical shock, do not mate unit connector until installation is complete and A.C. power is sup-

plied to the unit.

 2. 

CAUTION 

– This fixture provides more than one power supply output source. To reduce the risk of electrical shock, 

disconnect both normal and emergency sources by turning off the A.C. branch circuit and by disconnecting the unit 
connector.

 3. 

CAUTION 

– This is a sealed unit. Components are not replaceable. Replace the entire unit when necessary.

 4. 

CAUTION

 – Installation and servicing should be performed by 

qualified personnel only

. De-energize before opening.

 5.  The 

ILB-CP-HE-SD-XB

 is for use with grounded LED luminaires listed to UL standards.  Not for use in heated air out-

lets or hazardous locations.

 6.  The 

ILB-CP-HE-SD-XB

 requires an unswitched A.C. power source of 120 to 277 volts AC, 50/60Hz.

 7. 

The 

ILB-CP-HE-SD-XB

 and A.C. driver 

must 

be on the same branch circuit.

  8.  Do not mount near gas or electric heaters.

 9.  The 

ILB-CP-HE-SD-XB

 should be mounted in locations and at heights where it will not readily be subjected to tamper-

ing by unauthorized personnel.

 10. The 

ILB-CP-HE-SD-XB

 will supply 10-60VDC output at the individual rated specification for 90 minutes. See individual 

units for output specifications.

11.   The 

ILB-CP-HE-SD-XB 

is certified in the CA Title 20 Modernized Appliance Efficiency Database System (MAEDBS) 

as a small battery charger.

 12.  Suitable for use in damp locations and plenum spaces.

13.   Suitable for luminaires, recessed Type IC (intended for insulation contact).
 14.  For use in 0° C minimum, 55° C maximum ambient temperatures.
 15.  The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition, void war-

ranty, and result in non-compliance with UL specifications.

 16.  Do not use this equipment for other than intended use.

 17.  Install in accordance with the National Electrical Code and local regulations.

18.  Lighting fixture manufacturers, electricians, and end-users need to ensure product system compatibility before final 

installation.  See addendum for compatibility and covered luminaire requirements.

SAVE THESE  INSTRUCTIONS

 

EMERGENCY

LIGHTING EQUIPMENT FOR LED

WITH PUSH-IN CONNECTOR  

HARNESS

INSTRUCTION MANUAL

P.O. BOX 11846  TUCSON, AZ 85734 

(520) 294-3292   •  FAX (520) 741-2837

www.iotaengineering.com

Patented. 

See iotaengineering.com/patents for more details

ILB-CP-HE-SD-XB

HIGH EFFICIENCY PERFORMANCE 
MEETS CA T20 BATTERY CHARGER 
EFFICIENCY STANDARDS

EMERGENCY LED DRIVER FOR USE 
WITH LED LUMINAIRES IDENTIFIED 
IN THE MANUFACTURER’S  
INSTALLATION INSTRUCTIONS

E473237

Summary of Contents for ILB-CP-HE-SD-XB

Page 1: ...nel 10 The ILB CP HE SD XB will supply 10 60VDC output at the individual rated specification for 90 minutes See individual units for output specifications 11 The ILB CP HE SD XB is certified in the CA Title 20 Modernized Appliance Efficiency Database System MAEDBS as a small battery charger 12 Suitable for use in damp locations and plenum spaces 13 Suitable for luminaires recessed Type IC intended...

Page 2: ...B STEP 2 WIRING TO THE NORMAL LED DRIVER STEP 3 CONNECTING COMPONENTS TO THE PUSH IN PORT Mount the ILB CP SD XB in the driver lamp compartment or enclosed wireway so that the leads are not exposed providing at least space between normal AC driver and emergency driver components Install in accordance with National Electrical Code and local regulations Wire the ILB CP SD XB to the AC Driver input b...

Page 3: ...irmly insert the input power leads into the proper Orange Push In Connector ports Unswitched AC Line to ORG BLK Switched AC line to BLACK and AC Neutral to WHITE Push in leads should be stripped to 9mm 0 5 mm The Push In Connector is specified for single use Removal of the leads after insertion can result in damage to the connector and product failure For replacement push in connectors contact Cus...

Page 4: ...s its nominal input voltage will neces sitate a new Load Calibration see table below for how to conduct a manual Load Calibration Manual Testing can be performed on the ILB CP HE SD XB provided the unit is fully charged by pressing and releasing the TBTS or engaging the wall switch that controls the emergency luminaire Manual Testing cannot be initiated until the unit has received a full 24 hour c...

Reviews: