Goodrive600 series high-performance multifunction VFD
Communication networking
-159-
Ensure the electrical wiring is correct and secure.
Power on.
The panel data display is normal.
Restore to factory settings.
Set the command channel.
Set CANopen and DP addresses.
Start
Check the CANopen networking status.
Perform upper computer configuration.
Download and run the PLC user program.
Stop.
The commissioning is completed.
Rectifier: P00.14=1
Inverter: P00.18=1
Group P00
Rectifier: Groups P21
and P22
Inverter: Group P14
Inverter: P17.15
Figure 6-6 Commissioning procedure
6.5.6.2 TIA portal configuration (S7-300)
The following uses SIMATIC S7-300 as an example to describe the configuration procedure on TIA Portal.
(1) Create a project.
Double-click the TIA Portal V15 icon to start the TIA Portal V15 project tool. Then choose
Create new project
. On the
right of the interface, enter
Project name
,
Path
,
Version
,
Author
, and
Comment
, and click
Create
.