© Intralot Inc. MPNG Terminal Manual
–
October 2017
Page 22
7.3.
Reboot Terminal
The following message appears on the display:
Select Yes to process or No to cancel the action.
Chapter 8.
Terminal Basic Operations
8.1.
Power On Procedure
8.1.1.
Applying Power
Upon the application of power to the MPNG terminal the following Checking Peripherals screen appears:
If a test fails, an appropriate message is displayed to show where the error occurred.