SULFURYL FLUORIDE MANUAL REV C
PAGE 7 OF 23
04/07/11
Gas sample inlet PORT. Tubing is pushed into port until seated and then
gently
pulling
back. The pulling back action is performed to properly seal the connection. Teflon
tubing ¼ O.D. x 1/8 I.D. is recommended for use. Length should not exceed twelve
(12) inches when used with factory calibration. Lengths of twelve (12) to forty eight (48)
inches can be used only if calibrated with chosen length attached during process.
NOTE: Longer lengths than twelve (12) inches can increase response time.
Summary of Contents for GF1900
Page 1: ...SULFURYL FLUORIDE MANUAL REV C PAGE 1 OF 23 04 07 11 GF 1900 SULFURYL FLUORIDE ANALYZER ...
Page 2: ...SULFURYL FLUORIDE MANUAL REV C PAGE 2 OF 23 04 07 11 ...
Page 15: ...SULFURYL FLUORIDE MANUAL REV C PAGE 15 OF 23 04 07 11 Figure 3 BC1 24V PATTERY PACK CHARGER ...
Page 17: ...SULFURYL FLUORIDE MANUAL REV C PAGE 17 OF 23 04 07 11 DIAGRAMS SCHEMATICS PARTS ...
Page 18: ...SULFURYL FLUORIDE MANUAL REV C PAGE 18 OF 23 04 07 11 ...
Page 19: ...SULFURYL FLUORIDE MANUAL REV C PAGE 19 OF 23 04 07 11 ...
Page 22: ...SULFURYL FLUORIDE MANUAL REV C PAGE 22 OF 23 04 07 11 ...