Patriot Twin Analyst – Owner’s Manual – Revision 1.1
Page 10
System Installation & Start-up Guidelines
Clear the installation area and carefully sweep the floor where the system will be installed.
Test home water pressure and make sure it is 30 – 75 psi static. A code-compliant pressure regulator
must be installed to protect the system on all municipal water installations.
Check to confirm that the water heater has adequate heat expansion protection to protect the system from hot
water damage.
Install the system, drain and brine tank overflow according to prevailing local code
Bypass System.
Run bathtub cold to purge piping of debris and chemical residue from installation,
This will take approx. 5 minutes at 3gpm.
Leave bathtub running and slowly open the inlet valve to the system.
Slowly open the outlet valve from the system.
Observe flow of water from the bathtub. Water will become a dark brown/black color. This color is
caused by the system disinfectant/preservative as well as dust from shipping & handling. Allow water
to run until clear. Observe water for particles. If resin particles are found in the water, bypass the sys-
tem and call tech-support. - Leave the bathtub running
Program the system according to the programming instructions in this manual
Begin a cleaning cycle by pressing the
REGENERATE
button and holding for at least 3 seconds.
Advance the system through each cycle step by pressing the
SET
and
UP
buttons at the same time.
Observe the system during each cycle and then progressively advance to the next until the regenera-
tion terminates.
Once the system has been advanced to normal operating mode, observe the flow of water from the
bathtub again for disinfectant and resin. Allow water to run clear – Turn off bathtub
Begin another cleaning cycle by pressing the
CLEANING
button and holding for at least 3 seconds.
Advance the system through each cycle step by pressing the
SET
and
UP
buttons at the same time.
Observe the system during each cycle and then progressively advance to the next until the regenera-
tion reaches the Timed Brine Refill cycle. Leave it in that position.
Test water at any softened faucet to confirm acceptable soft water production from the system.