background image

3

Preliminary 1/22/02

instructions or reference manual for complete programming 
details.

1.

Set the panel to program mode.

2.

Proceed to the LEARN SENSORS menu.

3.

Select the appropriate zone type and zone number 
assignments.

4.

Set the external switch in the alarm condition (open for 
a normally closed circuit, closed for a normally open 
circuit).

5.

Trip the sensors tamper switch by removing the sensor 
cover.

6.

Exit program mode.

7.

Place the cover back on the sensor.

Testing

The following steps describe the general guidelines for test-
ing the sensor. Refer to the specific panel installation 
instructions or reference manual and the instructions for the 
external switch for complete testing details.

1.

Set the panel to the installer zone test mode.

2.

Trip the sensor.

3.

The signal strength from the UFT will be displayed on 
all keypads. It should be 15 or higher for proper opera-
tion.

Specifications

Operating Temperature 

Range: ........................... 10° to 120° F

Compatibility: ............... Advent Commercial Fire 250 Zone 

(60-562-03)
Advent Commercial Fire 132 Zone 
(60-562-06)
Advent Commercial Burg 250 
Zone (60-562-01)
Advent Commercial Burg 132 
Zone (60-562-04)

Power Source: ............... 1 AA 3.6-volt lithium battery (not 

replaceable)

Transmit Range: ............ At least 500 feet, open air

Summary of Contents for UFT

Page 1: ... Installation Guidelines Keep all sensors within 200 300 feet of the nearest transceiver module Mount sensors with screws or brads not double stick tape Place sensors at least 5 inches above the floor to avoid damaging them Use spacers not included to keep sensors and magnets away from metal or metallic surfaces such as foil wall paper Avoid mounting sensors in areas with a large quantity of metal...

Page 2: ...wall The magnet is installed in the box 1 Determine a suitable location for the UFT 2 Mark the box at the location where the magnet will be installed 3 Drill a 3 4 hole in the box at the magnet location 4 Insert the magnet into the hole 5 Mark where the UFT will be installed on the box 6 Verify the UFT reed switch is properly aligned with the magnet 7 Mount the box in the wall using screws or brad...

Page 3: ...al guidelines for test ing the sensor Refer to the specific panel installation instructions or reference manual and the instructions for the external switch for complete testing details 1 Set the panel to the installer zone test mode 2 Trip the sensor 3 The signal strength from the UFT will be displayed on all keypads It should be 15 or higher for proper opera tion Specifications Operating Tempera...

Page 4: ...e pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occu...

Reviews: