Introduction 

This document provides an overview of FlexPI

™ installation, 

setup, and calibration. It is intended as a guideline for 
experienced installation technicians. Refer to the FlexPI 
Product Guide and the UCM help files for complete details on 
installing, setting up, and calibrating FlexPI. 

Installing a FlexPI sensor is a four step process:  

1.  Design the system, and obtain the components.  

2.  Install the processor, enclosure, and power supply. 

3.  Install the sensor cable, terminator, and alarm data cables.  

4.  Setup, calibrate and test the system. 

The typical FlexPI system includes a processor in a plastic 
enclosure, sensor cable and a terminator. Customer-supplied 
cable fasteners, alarm data wiring, alarm annunciator, and a 
power supply are also required. 

Optional components include non-sensitive lead-in cable, 
splice kits, and Windows-based Universal Configuration 
Module (UCM) software. 

Cable spacing and fastening 
recommendations 

FlexPI sensor cable spacing depends on the type of building 
material, and the required level of security. Using multiple 
cable passes with reduced cable spacing provides the best 
detection sensitivity, and the highest level of security. Materials 
that conduct vibrations well require fewer cable passes than do 
surfaces that have a dampening effect on vibrations. 

For security cages and fencing: 

cable spacing up to 1 m (3.3 ft.) fastened every 30 cm (1 ft.) 

For walls: 

cable spacing up to 1.25 m (4 ft.) fastened every 30 cm (1 ft.) 

For roofs with steel beams: 

cable spacing up to 1.8 m (6 ft.) fastened every 30 cm (1 ft.) 

For roofs with wooden trusses: 

cable spacing app. 60 cm (2 ft.) fastened every 30 cm (1 ft.) 

The minimum recommended cable spacing is 30 cm (1 ft.).

 

Installation rules 

Mount the enclosure indoors at the start point of the sensor 
zone. OR mount the enclosure up to 30 m away from the zone 
and use lead-in cable to make the connection to the processor. 

Use one processor and sensor cable to protect one type of 
surface. 

Keep walls, roofs, ceilings and floors separate. 

DO NOT allow the sensor cable to fall off the reel during 
installation. 

DO NOT bend, twist, stretch, jerk, knot, or kink the sensor 
cable.  

DO NOT place objects on the sensor cable. 

Sensor cable MUST NOT be nicked, or scraped. 

Secure the cable to the surface at a constant height above 
ground. 

The sensor cable must be in close contact with the protected 
surface. 

Install fasteners so they hold the cable firmly against the 
surface without pressing into, or distorting the cable jacket. 

Avoid tight turns in the sensor cable. The smallest allowable 
bend radius for MEX sensor cable is 4 cm (1.5 in.). 

Apply consistent light tension (2 kg, 4.5 lb) to the cable while 
attaching it to the surface, to prevent the cable from sagging 
between fasteners. 

For installation in areas where the cable may be subject to 
damage from equipment or vandalism, install the cable inside 
metal conduit. 

Use cable loops for increased sensitivity near support 
structures and around corners. 

For security cages and fences: 

Attach the sensor cable to the secure side of the cage/fence 
(the side opposite the threat). 

Attach the sensor cable at least 30 cm (1 ft.) away from 
horizontal support bars and other cables. 

Hand tighten the cable ties until the cable is snug against the 
cage.  

DO NOT use mechanical tighteners, or over-tighten the cable 
ties.  

DO NOT allow the sensor cable to be pinched between the 
cage and a support post, or any other object. 

 

Summary of Contents for FlexPI

Page 1: ... roofs with wooden trusses cable spacing app 60 cm 2 ft fastened every 30 cm 1 ft The minimum recommended cable spacing is 30 cm 1 ft Installation rules Mount the enclosure indoors at the start point of the sensor zone OR mount the enclosure up to 30 m away from the zone and use lead in cable to make the connection to the processor Use one processor and sensor cable to protect one type of surface ...

Page 2: ...ge on each side of the support posts 30 cm 12 in Cable installation example wall mount 2 44 m 8 ft 1 22 m 4 ft 1 22 m 4 ft 81 cm 2 7 ft 81 cm 2 7 ft 81 cm 2 7 ft 2 44 m 8 ft double cable pass single cable pass terminator processor sensor cable alarm and power cable Cable installation example wall mount triple cable pass 61 cm 2 ft 2 44 m 8 ft 61 cm 2 ft 61 cm 2 ft 61 cm 2 ft triple cable pass plus...

Page 3: ...Remove 6 mm of center conductor insulator Join the cables center to center and shield to shield Press the terminal block and cable into the enclosure Snap the enclosure shut splice 2 Separate the braided shield Install the center conductor and shield in one side of the terminal block and the resistor in the other splice termination termination termination splice Apply 3 or 4 wraps of electrical ta...

Page 4: ...inals accept wires from 12 to 24 AWG RELAYCONNECTIONS 30V 0 5ARELAY T5 PWRINPUT 12 48VDC T4 SUPERVISION SONALERT ALARM NC COM NO NC COM NO COM NO FLEX IN GND shield center conductor VDC VDC alarm NO alarm COM alarm NC supervision NO supervisionCOM supervisionNC sonalert NO sonalert COM Connection details DIP switch settings DIP switch calibration 1 Set switch S5 4 to ON switch calibration and swit...

Page 5: ...lower the Gain 1 level If the processor does not always alarm for the impact attack simulations raise the Gain 1 level 4 Repeat this process until the sensor always detects the simulated attacks and the NAR is acceptable Connecting the Universal Configuration Module For UCM calibration set switch S5 4 to OFF and cycle the power Switch 5 4 must be OFF to operate with UCM configuration parameters Re...

Page 6: ...6 6 P N 1077877 REV 2 ISS 19MAR19 ...

Reviews: