Intel R1000 Quick Start Manual Download Page 10

 

Intel R1000 Quick Start 

 

 

10  

 

317118-001

 / Quick Start Guide 

ƒ

 

Intel RFID Tracer Demonstration Application 

o

 

Intel R1000 Evaluation Platform design collateral: 

ƒ

 

Base board & PA schematic 

ƒ

 

Base board and PA Gerber’s 

ƒ

 

Base board & PA BOM 

2.

 

Hard copy of this Quick Start Guide 

 

Note:

 

In order to use the Intel R1000 Evaluation Platform the users must supply the 

following components: 

1.

 

A Host platform. For the remainder of this document the host platform is 
assumed to be an IA-32 (aka. Pentium) based PC running Windows XP (SP1 or 
later). However other host platforms are possible, please see Intel R1000 
Software Development Kit Getting Started Guide for full details.  

2.

 

RFID ready antenna cables.  

3.

 

RFID ready antennas. 

4.

 

One or more 18000-6C Tags. 

 

2.3

 

Reading Tags with the Intel R1000 Development 
Platform 

Note:

 

The Intel R1000 Development Platform will always initialize in FCC mode, irrespective 

of whether the platform hardware is targeted for FCC or ETSI compliant regions. Please 
consult with your regulatory advisor to ensure you have the correct licences in place to 
broadcast in the FCC or ETSI spectrum.  In order to configure Intel R1000 Development 
Platform to ETSI mode please consult Intel RFID Tracer User Guide. 

Note:

 

All computer boards are sensitive to electrostatic discharge. Handle all static-sensitive 

boards and components at a static-safe work area, and observe anti-static precautions at all 
times. 

Note:

 

The Intel R1000 Development Platform is shipped with the Intel R1000 Firmware in 

persistent storage on the platform. No loading of the firmware is required in order to get the 
platform to read tags. 

Note:

 

The Intel R1000 Development Platform default register setting values allow tags to be 

read out of the box.  

Note:

 

Do not apply power to the system until the TX antenna ports have been terminated 

either by an antenna or a termination connector. 

Summary of Contents for R1000

Page 1: ...Intel R1000 Development Platform Quick Start Guide July 2007 Revision 1 1 Document Number 317118 ...

Page 2: ...ustaining applications Intel may make changes to specifications and product descriptions at any time without notice Designers must not rely on the absence or characteristics of any features or instructions marked reserved or undefined Intel reserves these for future definition and shall have no responsibility whatsoever for conflicts or incompatibilities arising from future changes to them The Int...

Page 3: ...roduction 5 1 1 Reference documents 5 2 Intel R1000 Quick Start 6 2 1 Overview 6 2 2 Intel R1000 Development Platform Package 6 2 3 Reading Tags with the Intel R1000 Development Platform 10 2 4 Changing the Host Interface from USB to UART 13 2 5 Next Steps 14 ...

Page 4: ...Introduction 4 317118 001 Quick Start Guide Revision history Document Number Revision Number Description Revision Date 1 0 Initial release April 2007 317118 1 1 Updated with Release 1 1 July 2007 ...

Page 5: ...rt Guide explains how to set up an Intel R1000 Development Platform and start reading tags out of the box 1 1 Reference documents Document Document Intel RFIR Transceiver Interface API Reference Manual 313410 Intel R1000 Firmware Interface Specification 316527 Intel R1000 Firmware Datasheet 314525 ...

Page 6: ... environment 2 2 Intel R1000 Development Platform Package The Intel R1000 Development Platform package includes the items listed below The user should first verify that all components are present if a component is missing please contact you Intel representative 1 Intel R1000 Development Platform base board RFID radio module housed in chassis 2 Intel R1000 Development Platform PA module housed in c...

Page 7: ... In general the chassis cover does not need to be removed Figure 2 shows the underside of the Intel R1000 Development Platform the red arrow points to which operating mode the development kit comes with as well as the default loaded firmware revision Figure 2 Intel R1000 development platform underside of chassis Figure 3 shows the topside of a typical Intel R1000 Development Platform unit ...

Page 8: ...ck Start Guide Figure 3 Intel R1000 development platform chassis top view 3 External 5V power supply module 110 240V 4 External power supply power cord Figure 4 shows the power supply module and power cord Figure 4 Power supply and power cord ...

Page 9: ...se see Intel R1000 Software Development Kit Getting Started Guide for full details Intel RFID Tracer Application binary files Please see Intel RFID Tracer Application User Guide for full details o Entire product documentation set Intel R1000 Datasheet Intel R1000 Evaluation Platform Application Note Intel R1000 Firmware Datasheet Intel R1000 Firmware Interface Specification Intel R1000 Quick Start...

Page 10: ...tform will always initialize in FCC mode irrespective of whether the platform hardware is targeted for FCC or ETSI compliant regions Please consult with your regulatory advisor to ensure you have the correct licences in place to broadcast in the FCC or ETSI spectrum In order to configure Intel R1000 Development Platform to ETSI mode please consult Intel RFID Tracer User Guide Note All computer boa...

Page 11: ...ch this application b Intel R1000 USB Bus Driver for Windows XP See Intel R1000 SDK Getting Started Guide for details of how to install the driver 2 Connect the components as depicted in the Figure 5 Figure 5 Component connections using USB Note Ensure that the tag is stationary positioned directly in front of the antenna at a distance of about 1 meter The goal is to verify correct setup rather th...

Page 12: ...he include this location in the search box and then use the browse button to select the path where the USB driver files usbharve sys and usbharve inf are located d A dialog will popup indicating that the driver has not passed Windows Logo Testing click the CONTINUE ANYWAY button Note If you are prompted again for a sys file on an installation disk just use the browse button and point the dialog to...

Page 13: ...00 the USB port can be omitted There are two ways to enable the UART interface Option 1 Using the debug port Edit the file RFIDcomm cfg Change the number 1 to the actual COM port you would like to use Then copy this file into the directory from which the Tracer application will run To locate the Tracer application executable use Explorer to view the directory C Documents and Settings USER Local Se...

Page 14: ...s connected to the debug port of the development platform Power up the development platform In the HyperTerminal window press the space bar before board boots to start the debug shell Enter the following commands to switch between USB UART FOR SERIAL write_oemcfg Valid OEM address are from 0x00 to 0xA2 Enter OEM config word ADDRESS 32 hex format NNNNNNNN q to abort 000000A0 Enter OEM config word D...

Page 15: ...tel R1000 Firmware Datasheet Intel R1000 Firmware Interface Specification Intel R1000 Host Software Intel R1000 SDK Getting Started Guide Intel RFID Transceiver Interface Reference Manual Intel R1000 Firmware Interface Specification Intel R1000 Tracer Application Intel RFID Tracer Application User Guide Intel R1000 SDK Getting Started User Guide Intel R1000 Development Platform Intel R1000 Develop...

Reviews: