Intel® Server System M20NTP1UR - System Integration and Service Guide
54
6.1
System Top Cover Removal / Installation
To maintain proper air flow within the system, the top cover must be in place when the system is operating.
Required Tools and Supplies
•
Anti-static wrist strap and conductive workbench pad (recommended)
•
Phillips* head screwdriver #1
6.1.1
System Top Cover Removal
Removal of the top cover is necessary when installing or replacing any system component within the server
chassis. Before removing the top cover, power down the system and unplug all cables from the back of the
system.
The top cover may be secured to the chassis using three screws, one on each side and one on the top. If
present, the screws must be removed before attempting to remove the top cover
.
1.
Power off the system and unplug all cables from the back of the system
2.
(If present) Remove the three screws that secure the top cover (see
Figure 55. System Top Cover Panel Shipping Screws
Note:
A non-skid surface or a stop behind the server system may be needed to prevent the server system
from sliding on the work surface.
3.
Remove the top Cover (See
Figure 56. System Cover Removal
•
While pushing down on both the left and right buttons (see Letter “B”), slide the top cover ~10mm
towards the back of the chassis (see Letter “C”).
•
Carefully lift the top cover up and away from the chassis.
Summary of Contents for M20NTP1UR
Page 2: ...2 This page intentionally left blank...
Page 101: ...Intel Server System M20NTP1UR System Integration and Service Guide 101 1 2 3 4 5...
Page 102: ...Intel Server System M20NTP1UR System Integration and Service Guide 102 1 2 3 4 5 6 1 2 3...
Page 103: ...Intel Server System M20NTP1UR System Integration and Service Guide 103 1 2 3 4 5...
Page 112: ...Intel Server System M20NTP1UR System Integration and Service Guide 112 1 2 3 4 5 ESD 6 1 2 3...
Page 113: ...Intel Server System M20NTP1UR System Integration and Service Guide 113 1 2 3 4 5...