Intel® Server System M20NTP1UR - System Integration and Service Guide
19
•
While pushing down on both the left and right buttons (see Letter “B”), slide the top cover
~10mm towards the back of the chassis (see Letter “C”).
•
Carefully lift the top cover up and away from the chassis.
2.1.2
System Top Cover Installation
To maintain proper air flow within the system, the top cover must be in place when the system is operating.
1.
Figure 5. System Cover Installation
•
Align and place the top cover on the top edges of the chassis.
•
Slide it towards the front of the chassis until it locks into place (see Letter “A”).
Shipping Note:
When transporting the server system, Intel recommends installing the three top cover
screws before shipping (see Letter “B”).
Summary of Contents for M20NTP1UR
Page 2: ...2 This page intentionally left blank...
Page 101: ...Intel Server System M20NTP1UR System Integration and Service Guide 101 1 2 3 4 5...
Page 102: ...Intel Server System M20NTP1UR System Integration and Service Guide 102 1 2 3 4 5 6 1 2 3...
Page 103: ...Intel Server System M20NTP1UR System Integration and Service Guide 103 1 2 3 4 5...
Page 112: ...Intel Server System M20NTP1UR System Integration and Service Guide 112 1 2 3 4 5 ESD 6 1 2 3...
Page 113: ...Intel Server System M20NTP1UR System Integration and Service Guide 113 1 2 3 4 5...