Intec Shingling Conveyor Installation Guide
Intec Shingling Conveyor Installation Guide
9
10
4. Roll the shingling conveyor into position. The conveyor table will not be at the correct height. Adjust height of front
legs by inserting height adjustment screw (X) into the top of front legs and turning in a clockwise rotation.
5. Raise the front of the conveyor until it’s edge is aligned with the top of the small rectangular groove as pictured
below (approx 20mm below exit slot).
6. Insert height adjustment screw (C) into rear feet as shown below and turn clockwise until conveyor table is level.
Insert black rectangular caps (A) into the top of the front legs.
Connecting power
Instructions for connecting power to the conveyor:
1. Locate power supply and power cord options in the accessory kit (provided). Select appropriate power cord
for your region and attach to the power supply and conveyor.
2. Plug the cable from the power supply into the back of the conveyor and power ON.
3. Conveyor will automatically advance to shingle media as it exits the printer. Increase/decrease speed of
belts as required.
Input controls
Instructions for the operation of the shingling conveyor:
SMALL RED LED
Power is being supplied and the
Conveyor Belt is ON
I / O SWITCH [ I ]
Power is ON
[ O ]
Power is OFF
WHITE BUTTON
Increases the belt speed for
more spacing between each
piece of media
BLACK BUTTON
Decreases the belt speed for
less spacing between each
piece of media
RED BUTTON
Starts or stops the Conveyor Belt
movement
LARGE RED LED
The Conveyor is not ready to
feed (press the RED button to
begin feed)
Summary of Contents for SHINGLING CONVEYOR
Page 1: ...SHINGLING CONVEYOR Installation Guide English...
Page 7: ......