background image

Intec Shingling Conveyor Installation Guide

Intec Shingling Conveyor Installation Guide

9

10

4. Roll the shingling conveyor into position. The conveyor table will not be at the correct height. Adjust height of front 
legs by inserting height adjustment screw (X) into the top of front legs and turning in a clockwise rotation.

5. Raise the front of the conveyor until it’s edge is aligned with the top of the small rectangular groove as pictured  
 

below (approx 20mm below exit slot). 

6. Insert height adjustment screw (C) into rear feet as shown below and turn clockwise until conveyor table is level. 
Insert black rectangular caps (A) into the top of the front legs.

Connecting power

Instructions for connecting power to the conveyor:

1. Locate power supply and power cord options in the accessory kit (provided). Select appropriate power cord
    for your region and attach to the power supply and conveyor.

2. Plug the cable from the power supply into the back of the conveyor and power ON.

3. Conveyor will automatically advance to shingle media as it exits the printer. Increase/decrease speed of  

 

 

belts as required.

Input controls

Instructions for the operation of the shingling conveyor:

SMALL RED LED

 

Power is being supplied and the  

 

Conveyor Belt is ON

I / O SWITCH [ I ]

  Power is ON

[ O ] 

 

Power is OFF

WHITE BUTTON 

Increases the belt speed for    

 

more spacing between each   

 

piece of media

BLACK BUTTON

   Decreases the belt speed for   

 

less spacing between each    

 

piece of media

RED BUTTON

  

Starts or stops the Conveyor Belt  

 movement

LARGE RED LED

   The Conveyor is not ready to

 

feed (press the RED button to

 

begin feed)

Reviews: