background image

© Intatec Ltd 2017

14

Recommended Outlet temperatures

The BuildCert TMV scheme recommends the following set maximum mixed water outlet 
temperature for use in all premises:

     The mixed water temperature must never exceed 43˚C.

    The maximum mixed water temperature can be 2 ˚C above the recommended maximum set 
    outlet temperature.

Note: 

43˚C is the maximum mixed water temperature from a shower mixer. The maximum 

    

temperature takes account of the allowable tolerances inherent in thermostatic shower

    

mixers and temperature losses.

    

It is not a safe bathing Temperature for adults or children

.

    

The British Burns Association recommends 37 to 37.5˚C as a comfortable bathing

    

temperature for children. In premises covered by the Care Standard Act 2000, the 

    

maximum mixed water outlet temperature is 43˚C.

Installation

Important

: -  The following instructions must be read prior to the installation of the 

    thermostatic shower valve. The installer of the thermostatic shower valve must comply with the 
    requirements of the Water supply (Water Fittings) Regulations 1999 and also be aware of their
    responsibility and duty of care to ensure that all aspects of the installation comply with the 
    regulations.

    It has been brought to our attention that flushing water systems using certain chemicals may 
    wholly or partially remove the lubricant from the internal workings of the valve, which may 
    adversely affect its performance. We recommend that following flushing the system with 
    chemicals; valves are checked for correct operation. 

   1.  It is essential that before installing any thermostatic shower valve to ensure that the supply 
        conditions of the system to which the valve is intended to be fitted are checked to confirm 
        compliance with the parameters as quoted within the technical specification and conditions 
        on which the approval is granted i.e. verify supply temperatures, supply pressures, risk 
        assessment.

   2.  Consideration must be made for the possibility of multiple / simultaneous demands being 
        made on the supply system whilst the thermostatic shower valve is in use, all practical 
        precautions must be made to ensure that the valve is not affected. Failure to make provision 
        within the pipe sizing etc. will affect the performance of the shower valve.

Application

Recommended Hot Water Temperature

Shower

41˚C

Summary of Contents for Nulo CB10031CP

Page 1: ...tion as accurate as possible We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or...

Page 2: ...pplied at a safe temperature to suit the users The shower is pre set using ideal conditions to 38 C at the stop with a manual push button override to 46 C can be re set to suit site conditions or user...

Page 3: ...et Temperature 85 C Max Inlet Pressure Dynamic 5 bar Pre Set Factory Temp Setting 38 C Min Operating Pressure Dynamic 0 2 bar Temperature Stability 2 C Max Unbalanced Pressure Ratio 5 1 Min Temp Diffe...

Page 4: ...her than the hot supply we recommend that a separate pressure reducing valve is fitted to the cold supply as close as possible to the shower valve and with no draw off points between it and the shower...

Page 5: ...lt the pump manufacturer s installation requirements Gravity System The drawing shows a typical installation of a shower valve on a gravity supplied system Please note the minimum head pressure requir...

Page 6: ...ter or plaster board should all be considered when routing the hot and cold supply pipes The valve requires the supply pipes and wall brackets to have 150mm centres and sufficient copper pipe must pro...

Page 7: ...inside edge of the concealing plates position over the compression faces and press firmly to the wall Installing the Shower Valve The connector 10 check valve 9 filter 8 union nut 11 and sealing wash...

Page 8: ...ow control 1 and allow the outlet temperature to stabilise from the bottom outlet Temporarily refit the control knob bush 8 and control knob 6 and using a digital thermometer it is possible to increas...

Page 9: ...have a high quality finish and should be treated with care An occasional wipe with a mild washing up liquid on a soft damp cloth followed by a thorough rinsing is all that is required The nozzles in t...

Page 10: ...t at cold the showering temperature is too hot The hot and cold supply connections have been made in reverse Thermostatic cartridge movement limited due to lime scale build up The maximum showering te...

Page 11: ...ble Riser Rail Dimensions 42 5 652 Ctr 684 1 2 3 4 6 7 8 5 Wall Bracket End Cap Details 15 Item Qty Component 1 2 Wall Bracket 2 2 End Cap 3 1 Riser Rail 4 1 Handset Holder 5 2 Retaining Screw Plug 6...

Page 12: ...ail Dimensions 42 5 652 Ctr 684 1 2 3 4 7 8 5 6 Wall Bracket End Cap Details 30 15 Item Qty Component 1 2 Wall Bracket 2 2 End Cap 3 1 Riser Rail 4 1 Handset Holder 5 2 Retaining Screw Plug 6 1 Push B...

Page 13: ...all the way behind the ceramic tile Using the screw provided secure the wall bracket 1 to the wall ensuring the correct orientation for the bracket Assemble the handset holder onto the riser rail as...

Page 14: ...ure the conditions of use are appropriate for the valve Introduction The thermostatic shower valve has been specifically designed and manufactured to meet the requirements of BS EN1111 1999 and TMV2 T...

Page 15: ...99 and also be aware of their responsibility and duty of care to ensure that all aspects of the installation comply with the regulations It has been brought to our attention that flushing water system...

Page 16: ...e s to within the limits as quoted previously 8 Any thermostatic shower valve must be fitted with a back flow prevention device such as check valves to prevent the cross contamination of supplies The...

Page 17: ...eratures are established before any attempt to commission 4 Once the supply temperatures are stable and the normal operating conditions are established the shower valve can be commissioned The followi...

Page 18: ...g performance checks shall be carried out 1 Measure the mixed water temperature at the outlet 2 Carry out the cold water supply isolation test by isolating the cold water supply wait for five seconds...

Page 19: ...Intatec Ltd 2017 18 Notes...

Page 20: ...n Staffordshire ST18 0PF Tel 01889 272 180 Fax 01889 272 181 email sales intatec co uk web www intatec co uk E O E 10 08 17 To activate your product warranty please visit www intatec co uk and click o...

Reviews: